|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/7/2024 Measured TD: 8228 ft. Vertical TD: 8066 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/7/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/19/2012 | | Proposed Top PZ Location: | Sec:12 Twp: 1N 67W | Footage: 1320 FSL 2590 FWL | | Bottom Hole Location: | Sec:12 Twp: 1N 67W | Footage: 1320 FSL 2590 FWL | | Proposed Depth/Form: | 8217 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8217 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8217 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/20/2011 | | Spud Date: | 1/17/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8228 ft. | Measured PB depth: | 8182 ft. | | True Vertical TD: | 8066 ft. | True Vertical PB depth: | 8001 ft. | | Top PZ Location: | Sec:12 Twp: 1N 67W | Footage: 1318 FSL 2599 FWL | | Bottom Hole Location: | Sec:12 Twp: 1N 67W | Footage: 1314 FSL 2603 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | GR-CCL-CB-VDL, CD-CN-ML, HRI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 928 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8212 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6615 ft., Bottom: 8212 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5128 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 615, Top: 745 ft., Bottom: 5128 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4284 ft. | | | | | SUSSEX | 4981 ft. | | | | | SHANNON | 5675 ft. | | | | | NIOBRARA | 7303 ft. | | | | | FORT HAYS | 7609 ft. | | | | | CODELL | 7632 ft. | | | | | J SAND | 8060 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/7/2024 Interval Top: 8076 ft. Interval Bottom: 8108 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/3/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 147,630 gal Slickwater w/ 116,840# 40/70, 4,000# SB Excel . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8076 ft. | # Of Holes: | 62 | | Interval Bottom: | 8108 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/26/2011 Interval Top: 7420 ft. Interval Bottom: 8108 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/3/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/23/2011 | | Treatment Summary: | COMMINGLED |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/26/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 38 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 5368 | | CALC_MCF_GAS | 204 | | CASING_PRESS | 755 | | GRAVITY_OIL | 46 | | MCF_GAS | 204 |
| | Perforation Data: | | Interval Top: | 7420 ft. | # Of Holes: | 182 | | Interval Bottom: | 8108 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/7/2024 Interval Top: 7420 ft. Interval Bottom: 7652 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/3/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/23/2011 | | Treatment Summary: | NB PERF 7420-7494 HOLES 66 SIZE .42 CD PERF 7634-7652 HOLES 54 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 247,380 gal Slickwater w/ 201,240# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 204,834 gal Slickwater w/ 150,620# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7420 ft. | # Of Holes: | 120 | | Interval Bottom: | 7652 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/07/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|