|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2022 Measured TD: 8280 ft. Vertical TD: 8134 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/30/2012 | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 2610 FNL 1330 FEL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 2610 FNL 1330 FEL | Proposed Depth/Form: | 8261 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 777, Top: , Bottom: 1110 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8261 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8261 ft. |
| | |
Wellbore Completed | Completion Date: | 6/20/2011 | Spud Date: | 6/16/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8280 ft. | Measured PB depth: | 8248 ft. | True Vertical TD: | 8134 ft. | True Vertical PB depth: | 8102 ft. | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 2595 FNL 1308 FEL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 2592 N 1306 E | Log Types: | PRE FORM 5 | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT @ 1140' | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 0 ft., Bottom: 1126 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 6513 ft., Bottom: 8264 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 824 ft., Depth: 5829 ft., Bottom: 5829 ft., Sacks: 672, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 820 ft., Depth: 5820 ft., Bottom: 5820 ft., Sacks: 672, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7402 ft. | | | | FORT HAYS | 7676 ft. | | | | CODELL | 7700 ft. | | | | J SAND | 8110 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 8115 ft. Interval Bottom: 8152 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/20/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/22/2011 | Treatment Summary: | J S PERF 8115-8152 TOTAL 54 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,008 gal Slickwater w/ 115,120# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8115 ft. | # Of Holes: | 54 | Interval Bottom: | 8152 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/22/2011 Interval Top: 7432 ft. Interval Bottom: 8152 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/20/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/22/2011 | Treatment Summary: | NB PERF 7432-7512 TOTAL 60 SIZE 0.42
CD PERF 7662-7678 TOTAL 64 SIZE 0.42
J S PERF 8115-8152 TOTAL 54 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8073 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/22/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 20 | BTU_GAS | 1309 | CALC_BBLS_OIL | 20 | CALC_GOR | 2500 | CALC_MCF_GAS | 50 | CASING_PRESS | 546 | GRAVITY_OIL | 46 | MCF_GAS | 50 |
| Perforation Data: | Interval Top: | 7432 ft. | # Of Holes: | 178 | Interval Bottom: | 8152 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 7432 ft. Interval Bottom: 7678 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/20/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/8/2011 | Treatment Summary: | NB PERF 7432-7512 TOTAL 60 SIZE 0.42 CD PERF 7662-7678 TOTAL 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 245,608 gal Slickwater w/ 201,620# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 203,329 gal Slickwater w/ 150,840# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7432 ft. | # Of Holes: | 124 | Interval Bottom: | 7678 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 04/30/2022 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|