Wellbore #00 Wellbore Classification: GW Status: AB - 2/13/2024 Measured TD: 8024 ft. Vertical TD: 7966 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/13/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/22/2012 | | Proposed Top PZ Location: | Sec:11 Twp: 2N 68W | Footage: 611 FSL 722 FWL | | Bottom Hole Location: | Sec:11 Twp: 2N 68W | Footage: 610 FSL 721 FWL | | Proposed Depth/Form: | 8115 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8115 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7058 ft., Bottom: 8115 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/14/2011 | | Spud Date: | 9/10/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8024 ft. | Measured PB depth: | 7978 ft. | | True Vertical TD: | 7966 ft. | True Vertical PB depth: | 7920 ft. | | Top PZ Location: | Sec:11 Twp: 2N 68W | Footage: 611 FSL 722 FWL | | Bottom Hole Location: | Sec:11 Twp: 2N 68W | Footage: 610 FSL 721 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 752 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 752 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8010 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 664, Top: 2830 ft., Bottom: 8010 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4258 ft. | | | | | NIOBRARA | 7204 ft. | | | | | CODELL | 7468 ft. | | | | | J SAND | 7893 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/13/2024 Interval Top: 7910 ft. Interval Bottom: 7932 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/14/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/12/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 7910'-7932', (44 HOLES) W/144,648 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,230# 20/40 SAND. 10/12/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7910 ft. | # Of Holes: | 44 | | Interval Bottom: | 7932 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/6/2023 Interval Top: 7468 ft. Interval Bottom: 7484 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7468 ft. | # Of Holes: | 32 | | Interval Bottom: | 7484 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/30/2011 Interval Top: 7248 ft. Interval Bottom: 7932 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/30/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7195'. DRILLED OUT CBP @ 7195’, CFP @ 8350’ AND 7600’ TO COMMINGLE THE JSND-CDL-NBRR. 11/10/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7902 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 159 | | BTU_GAS | 1292 | | CALC_BBLS_OIL | 159 | | CALC_GOR | 5503 | | CALC_MCF_GAS | 875 | | CASING_PRESS | 875 | | GRAVITY_OIL | 48 | | MCF_GAS | 875 | | TUBING_PRESS | 528 |
| | Perforation Data: | | Interval Top: | 7248 ft. | # Of Holes: | 160 | | Interval Bottom: | 7932 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/13/2024 Interval Top: 7248 ft. Interval Bottom: 7484 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/14/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/12/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7600’. 10/12/2011. FRAC’D THE CODELL 7468’-7484’, (32 HOLES) W/104,622 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,180# 20/40 SAND. 10/12/11. SET CFP @ 7350’. 10/12/11. FRAC’D THE NIOBRARA 7248’-7269’ (84 HOLES), W/130,536 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,280 # 20/40 SAND. 10/12/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7248 ft. | # Of Holes: | 116 | | Interval Bottom: | 7484 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/6/2023 Interval Top: 7248 ft. Interval Bottom: 7269 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7248 ft. | # Of Holes: | 84 | | Interval Bottom: | 7269 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|