|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2022 Measured TD: 8750 ft. Vertical TD: 8609 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/27/2012 | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1390 FSL 42 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1390 FSL 42 FEL | Proposed Depth/Form: | 8573 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8573 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 200 ft., Bottom: 8573 ft. |
| | |
Wellbore Completed | Completion Date: | 1/14/2011 | Spud Date: | 1/8/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8750 ft. | Measured PB depth: | 8646 ft. | True Vertical TD: | 8609 ft. | True Vertical PB depth: | 8505 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1390 FSL 42 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1390 S 42 E | Log Types: | Compensated Density Compensated Neutron Dual Induction
Cement Bond Log Gamma Ray | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 945 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 0 ft., Bottom: 945 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8712 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 755, Top: 4190 ft., Bottom: 8712 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4498 ft. | | | | SUSSEX | 4898 ft. | | | | NIOBRARA | 7696 ft. | | | | FORT HAYS | 8119 ft. | | | | CODELL | 8142 ft. | | | | J SAND | 8572 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 11/1/2022 Interval Top: 8580 ft. Interval Bottom: 8587 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/21/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/23/2012 | Treatment End Date: | N/A | Treatment Summary: | CIBP that was set at 8250' was pulled, allowing production from the J-Sand. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | No | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 4/10/2012 | Treatment Summary: | J-Sand Slickwater frac with a total of 219,667 gal of FR-66 water, 500 gal of 15% HCL, and 90,020 30/50 white sand | Formation Treatment | Treatment Date: | 4/10/2011 | Treatment Summary: | STEMOIL FRAC THE JSAND FROM 8580 TO 8587, THE JSAND FORMATION BROKE AT 4403 PSI, AND TREATED AT AN AVERAGE RATE OF 62.3 BPM, AVERAGE TREATMENT PRESSURE 4808 PSI, THE TOTAL FLUID PUMPED WAS 5362 BBL, THE TOTAL PROPPANT WAS 88.649 POUNDS OF 30/50 OTTAWA SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1119 | CALC_BBLS_H2O | 2 | CALC_MCF_GAS | 76 | CASING_PRESS | 1840 |
| Perforation Data: | Interval Top: | 8580 ft. | # Of Holes: | 42 | Interval Bottom: | 8587 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: PR - 11/1/2022 Interval Top: 8142 ft. Interval Bottom: 8156 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/11/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/23/2012 | Treatment End Date: | N/A | Treatment Summary: | CIBP that was set at 8250' was pulled, allowing production from the J-Sand.
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | No | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 3/26/2012 | Treatment Summary: | Codell Slickwater Frac with a total of 162,837 FR-66 water and 1250 *100lbs of 30/50 ottowa sand. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8142 ft. | # Of Holes: | 57 | Interval Bottom: | 8156 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 12/14/2012 Interval Top: 8142 ft. Interval Bottom: 8587 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 4/11/2012 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/24/2012 | Treatment End Date: | N/A | Treatment Summary: | CIBP that was set at 8250' was pulled, allowing production from the J-Sand. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/11/2012 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 22 | BTU_GAS | 49 | CALC_BBLS_OIL | 22 | CALC_GOR | 2000 | CALC_MCF_GAS | 44 | CASING_PRESS | 1200 | GRAVITY_OIL | 1119 | MCF_GAS | 44 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 8142 ft. | # Of Holes: | 99 | Interval Bottom: | 8587 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 67 |
Total Gas Produced (MCF) | 4618 |
GOR | 68925 |
GOR Determination | MCFE |
Average BOE per Day | 2.358 |
Average MCFE per Day | 13.684 |
Federal Financial Assurance | i | |
|
|