|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/14/2023 Measured TD: 7967 ft. Vertical TD: 7828 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/14/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/24/2013 | | Proposed Top PZ Location: | Sec:14 Twp: 4N 66W | Footage: 50 FSL 2500 FWL | | Bottom Hole Location: | Sec:14 Twp: 4N 66W | Footage: 50 FSL 2500 FWL | | Proposed Depth/Form: | 7920 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 182, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7920 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 182, Top: 6786 ft., Bottom: 7920 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/2/2012 | | Spud Date: | 1/27/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7967 ft. | Measured PB depth: | 7912 ft. | | True Vertical TD: | 7828 ft. | True Vertical PB depth: | 7773 ft. | | Top PZ Location: | Sec:14 Twp: 4N 66W | Footage: 56 FSL 2473 FWL | | Bottom Hole Location: | Sec:14 Twp: 4N 66W | Footage: 57 FSL 2461 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 548 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 0 ft., Bottom: 548 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7954 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 3530 ft., Bottom: 7954 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4469 ft. | | | | | NIOBRARA | 7031 ft. | | | | | CODELL | 7344 ft. | | | | | J SAND | 7809 ft. | | | |
Formation JSND Formation Classification: Status: AB - 3/23/2023 Interval Top: 7830 ft. Interval Bottom: 7870 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/9/2012 | | Treatment Summary: | Frac'd the J-Sand 7,830’-7,870’, (52 holes) w/ 65,646 gal 18 # pHaser Hybrid cross
linked gel containing 250,320 # 20/40 Sand. 02-09-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7830 ft. | # Of Holes: | 52 | | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 6/19/2012 Interval Top: 7344 ft. Interval Bottom: 7362 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/9/2012 | | Treatment Summary: | Set CFP @ 7412'. 02-09-12
Frac'd the Codell 7344’ – 7362’ (36 holes) w/ 91,560 gal 22# pHaser Hybrid cross linked gel
containing 250,320 # 20/40 sand. 02-09-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7344 ft. | # Of Holes: | 36 | | Interval Bottom: | 7362 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/14/2012 Interval Top: 7046 ft. Interval Bottom: 7870 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/14/2012 | | Treatment Summary: | Set CBP @ 6950'. 03-08-12
Drilled out CBP @ 6950', CFP @ 7286' and 7412' to commingle the JSND-NBRR-CDL. 03-10-12
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7006 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/14/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 65 | | BTU_GAS | 1231 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 18138 | | CALC_MCF_GAS | 1179 | | CASING_PRESS | 1483 | | GRAVITY_OIL | 63 | | MCF_GAS | 1179 | | TUBING_PRESS | 1275 |
| | Perforation Data: | | Interval Top: | 7046 ft. | # Of Holes: | 116 | | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 3/23/2023 Interval Top: 7046 ft. Interval Bottom: 7362 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7046 ft. | # Of Holes: | 64 | | Interval Bottom: | 7362 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 6/19/2012 Interval Top: 7046 ft. Interval Bottom: 7236 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/9/2012 | | Treatment Summary: | Set CFP @ 7286'. 02-09-12
Frac'd the Niobrara 7046– 7236’ (28 holes), w/ 103,026 gals 18 # pHaser Hybrid cross
linked gel containing 250,320 # 20/40 sand. 02-09-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7046 ft. | # Of Holes: | 28 | | Interval Bottom: | 7236 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/23/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/08/2022 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|