|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2020 Measured TD: 7800 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2020 | Wellbore Permit | | Permit #: | | Expiration Date: | 6/22/2012 | Prop Depth/Form: | 7800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 0 ft., Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7800 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 739, Top: , Bottom: 7800 ft. |
| | |
Wellbore Completed | Completion Date: | 1/21/2012 | Spud Date: | 1/17/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7800 ft. | Measured PB depth: | 7729 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL
Triple Combo
| Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 243, Top: 0 ft., Bottom: 738 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7775 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 3293 ft., Bottom: 7775 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2640 ft. | | | | PARKMAN | 3805 ft. | | | | SUSSEX | 4400 ft. | | | | SHANNON | 5020 ft. | | | | NIOBRARA | 6956 ft. | | | | FORT HAYS | 7148 ft. | | | | CODELL | 7173 ft. | | | | D SAND | 7573 ft. | | | | MOWRY | 7616 ft. | | | | J SAND | 7628 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 9/1/2020 Interval Top: 7630 ft. Interval Bottom: 7682 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/26/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/24/2012 | Treatment Summary: |
Pumped 251,179 lbs of Ottawa Proppant, 13,292 lbs of SB Excel Proppant and 147137 gallons of Silverstim.
The J-Sand and Codell are producing through composite flow through plugs |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/9/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 98 | BBLS_OIL | 42 | BTU_GAS | 1225 | CALC_BBLS_H2O | 98 | CALC_BBLS_OIL | 42 | CALC_GOR | 10976 | CALC_MCF_GAS | 461 | CASING_PRESS | 925 | GRAVITY_OIL | 56 | MCF_GAS | 461 |
| Perforation Data: | Interval Top: | 7630 ft. | # Of Holes: | 80 | Interval Bottom: | 7682 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/9/2012 Interval Top: 7008 ft. Interval Bottom: 7682 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/26/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/9/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 98 | BBLS_OIL | 42 | BTU_GAS | 1225 | CALC_BBLS_H2O | 98 | CALC_BBLS_OIL | 42 | CALC_GOR | 10976 | CALC_MCF_GAS | 461 | CASING_PRESS | 925 | GRAVITY_OIL | 56 | MCF_GAS | 461 |
| Perforation Data: | Interval Top: | 7008 ft. | # Of Holes: | 168 | Interval Bottom: | 7682 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 9/1/2020 Interval Top: 7008 ft. Interval Bottom: 7188 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/26/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/25/2012 | Treatment Summary: |
Pumped 457,386 lbs of Ottawa Proppant and 266,295 gallons of 15% HCL, Slick Water and Silverstim.
The J-Sand and Codell are producing through composite flow through plugs |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/9/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 98 | BBLS_OIL | 42 | BTU_GAS | 1225 | CALC_BBLS_H2O | 98 | CALC_BBLS_OIL | 42 | CALC_GOR | 10976 | CALC_MCF_GAS | 461 | CASING_PRESS | 925 | GRAVITY_OIL | 56 | MCF_GAS | 461 |
| Perforation Data: | Interval Top: | 7008 ft. | # Of Holes: | 88 | Interval Bottom: | 7188 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|