|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/29/2019 Measured TD: 8165 ft. Vertical TD: 8012 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/29/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/16/2012 | Proposed Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 2590 FNL 1345 FEL | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 2590 FNL 1345 FEL | Proposed Depth/Form: | 8132 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 665, Top: , Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8132 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8132 ft. |
| | |
Wellbore Completed | Completion Date: | 2/4/2011 | Spud Date: | 1/31/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8165 ft. | Measured PB depth: | 8123 ft. | True Vertical TD: | 8012 ft. | True Vertical PB depth: | 7970 ft. | Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 2585 FNL 1358 FEL | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 2594 N 1373 E | Log Types: | CD-CN-ML, HRI; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 968 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 610, Top: 0 ft., Bottom: 968 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8154 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 6532 ft., Bottom: 8154 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5007 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 884 ft., Bottom: 5012 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 885 ft., Depth: 5007 ft., Bottom: 5007 ft., Sacks: 410, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3984 ft. | 4200 ft. | | | SUSSEX | 4370 ft. | 4639 ft. | | | SHANNON | 4990 ft. | 5020 ft. | | | NIOBRARA | 7342 ft. | | | | FORT HAYS | 7567 ft. | | | | CODELL | 7588 ft. | | | | J SAND | 7990 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 4/29/2019 Interval Top: 7992 ft. Interval Bottom: 8024 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/31/2011 | Treatment Summary: | J S Perf 7992-8024 Holes 48 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,302 gal Slickwater w/ 115,180# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7992 ft. | # Of Holes: | 48 | Interval Bottom: | 8024 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/28/2011 Interval Top: 7342 ft. Interval Bottom: 8024 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/31/2011 | Treatment Summary: | NB Perf 7342-7466 Holes 72 Size 0.42
CD Perf 7590-7602 Holes 48 Size 0.42
J S Perf 7992-8024 Holes 48 Size 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 38 | BTU_GAS | 1249 | CALC_BBLS_OIL | 38 | CALC_GOR | 2632 | CALC_MCF_GAS | 100 | CASING_PRESS | 1800 | GRAVITY_OIL | 49 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7342 ft. | # Of Holes: | 168 | Interval Bottom: | 8024 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/29/2019 Interval Top: 7342 ft. Interval Bottom: 7602 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/18/2011 | Treatment Summary: | NB Perf 7342-7466 Holes 72 Size 0.42 CD Perf 7590-7602 Holes 48 Size 0.42
Frac Niobrara down 4-1/2" Csg w/ 252 gal 15% HCl & 245,238 gal Slickwater w/ 201,240# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 196,392 gal Slickwater w/ 150,620# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7342 ft. | # Of Holes: | 120 | Interval Bottom: | 7602 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 04/29/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|