|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/30/2019 Measured TD: 8425 ft. Vertical TD: 8028 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/30/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/16/2012 | Proposed Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 1999 FNL 663 FEL | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 2000 FNL 690 FEL | Proposed Depth/Form: | 8366 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 665, Top: , Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8366 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8366 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/26/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8425 ft. | Measured PB depth: | 8379 ft. | True Vertical TD: | 8028 ft. | True Vertical PB depth: | 7982 ft. | Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 1999 FNL 663 FEL | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 2000 N 690 E | Log Types: | CD-CN-ML, HRI; CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 972 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 610, Top: 0 ft., Bottom: 972 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8411 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1075, Top: 1500 ft., Bottom: 8411 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1480 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 380, Top: 30 ft., Bottom: 1480 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 80 ft., Depth: 8411 ft., Bottom: 1480 ft., Sacks: 345, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4190 ft. | | | | SUSSEX | 4674 ft. | | | | SHANNON | 5242 ft. | | | | NIOBRARA | 7530 ft. | | | | CODELL | 7820 ft. | | | | J SAND | 8246 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 4/30/2019 Interval Top: 8250 ft. Interval Bottom: 8282 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/31/2011 | Treatment Summary: | J S Perf 8250-8282 Holes 56 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 149,100 gal Slickwater w/ 115,700# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8250 ft. | # Of Holes: | 56 | Interval Bottom: | 8282 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/28/2011 Interval Top: 7558 ft. Interval Bottom: 8282 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/31/2011 | Treatment Summary: | NB Perf 7558-7562 Holes 12 Size 0.47
CD Perf 7822-7842 Holes 60 Size 0.42
J S Perf 8250-8282 Holes 56 Size 0.42
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 38 | BTU_GAS | 1249 | CALC_BBLS_OIL | 38 | CALC_GOR | 2632 | CALC_MCF_GAS | 100 | CASING_PRESS | 1850 | GRAVITY_OIL | 49 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7558 ft. | # Of Holes: | 128 | Interval Bottom: | 8282 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/30/2019 Interval Top: 7558 ft. Interval Bottom: 7842 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/14/2011 | Treatment Summary: | NB Perf 7558-7562 Holes 12 Size 0.47 CD Perf 7822-7842 Holes 60 Size 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 248,600 gal Slickwater w/ 200,460# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 193,284 gal Slickwater w/ 150,360# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7558 ft. | # Of Holes: | 72 | Interval Bottom: | 7842 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 04/30/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|