|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2025 Measured TD: 7504 ft. Vertical TD: 7472 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/26/2012 | | Proposed Top PZ Location: | Sec:21 Twp: 4N 66W | Footage: 2542 FSL 2524 FWL | | Bottom Hole Location: | Sec:21 Twp: 4N 66W | Footage: 2540 FSL 2532 FWL | | Proposed Depth/Form: | 7443 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 530 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 530 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7465 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: , Bottom: 7465 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/20/2012 | | Spud Date: | 1/17/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7504 ft. | Measured PB depth: | 7451 ft. | | True Vertical TD: | 7472 ft. | True Vertical PB depth: | 7419 ft. | | Top PZ Location: | Sec:21 Twp: 4N 66W | Footage: 2542 FSL 2524 FWL | | Bottom Hole Location: | Sec:21 Twp: 4N 66W | Footage: 2540 FSL 2532 FWL | | Log Types: | CBL
Triple Combo
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 601 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 257, Top: 0 ft., Bottom: 601 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7496 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 2554 ft., Bottom: 7496 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2490 ft. | | | | | PARKMAN | 3727 ft. | | | | | SUSSEX | 4438 ft. | | | | | SHANNON | 4818 ft. | | | | | NIOBRARA | 6963 ft. | | | | | FORT HAYS | 7267 ft. | | | | | CODELL | 7289 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 4/3/2025 Interval Top: 7291 ft. Interval Bottom: 7306 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/22/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/21/2012 | | Treatment Summary: |
Pumped 217,337 lbs of Ottawa Proppant and 117,006 gallons of 15% HCL, Slick Water and Silverstim.
The Codell is producing through a composite flow through plug
Commingle the Niobrara and Codell
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7291 ft. | # Of Holes: | 60 | | Interval Bottom: | 7306 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 6982 ft. Interval Bottom: 7306 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/22/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 17 | | BTU_GAS | 1218 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 17118 | | CALC_MCF_GAS | 291 | | CASING_PRESS | 975 | | GRAVITY_OIL | 59 | | MCF_GAS | 291 |
| | Perforation Data: | | Interval Top: | 6982 ft. | # Of Holes: | 108 | | Interval Bottom: | 7306 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 4/3/2025 Interval Top: 6982 ft. Interval Bottom: 7091 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/22/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/21/2012 | | Treatment Summary: |
Pumped 202,505 lbs of Ottawa Proppant and 155,296 gallons of Slick Water and Silverstim
Commingle the Niobrara and Codell |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6982 ft. | # Of Holes: | 48 | | Interval Bottom: | 7091 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 10/25/2024 |
| Defined Inactive (SI ) | Y | Defined Inactive 11/17/2024 |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|