|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/22/2010 Measured TD: 8086 ft. Vertical TD: 7941 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/22/2010 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/10/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 2549 FNL 1495 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 2545 FNL 1505 FWL | | Proposed Depth/Form: | 8045 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: , Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8045 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7024 ft., Bottom: 8045 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/17/2010 | | Spud Date: | 7/11/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8086 ft. | Measured PB depth: | 8033 ft. | | True Vertical TD: | 7941 ft. | True Vertical PB depth: | 7888 ft. | | Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 2549 FNL 1495 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 2545 FNL 1505 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 8.625 in., Top: 0 ft., Depth: 796 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 277, Top: 0 ft., Bottom: 796 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8079 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 5500 ft., Bottom: 8079 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4490 ft. | | | | | NIOBRARA | 7218 ft. | | | | | CODELL | 7498 ft. | | | | | J SAND | 7966 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 12/22/2010 Interval Top: 7966 ft. Interval Bottom: 7984 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/4/2010 | | Treatment Summary: | J SAND COMPLETION: FRAC'D TEH J-SAND WITH 153,678 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,480# 20/40 SAND. 08-04-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7966 ft. | # Of Holes: | 40 | | Interval Bottom: | 7984 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/28/2010 Interval Top: 7264 ft. Interval Bottom: 7984 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/4/2010 | | Treatment Summary: | JSND-NBRR-COMMINGLE: SET CBP @ 7160'. 08-16/10. DRILLED OUT CBP @ 7160', CFP @ 7380' AND CFP @ 7620' TO COMMINGLE THE JSND-CDL-NBRR. 08-17-10 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7943 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/28/2010 | Test Method: | FLOWING | | Hours Tested: | 23 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 59 | | BBLS_OIL | 167 | | CALC_BBLS_H2O | 61 | | CALC_BBLS_OIL | 174 | | CALC_GOR | 2437 | | CALC_MCF_GAS | 424 | | CASING_PRESS | 2035 | | MCF_GAS | 408 | | TUBING_PRESS | 1282 |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 156 | | Interval Bottom: | 7984 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 12/22/2010 Interval Top: 7264 ft. Interval Bottom: 7516 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/4/2010 | | Treatment Summary: | CDL-NBRR COMPLETION: SET CFP @ 7620'. 08-04-10. FRAC'D THE CODELL WITH 109,914 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,980# 20/40 SAND. SET CFP @ 7380'. 08-04-10. FRAC'D THE NIOBRARA WITH 139,944 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,380# 20/40 SAND. 08-04-10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 116 | | Interval Bottom: | 7516 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 209 |
| Total Gas Produced (MCF) | 10155 |
| GOR | 48588 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.707 |
| Average MCFE per Day | 33.098 |
| Federal Financial Assurance | i | |
|
|