|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/19/2023 Measured TD: 8119 ft. Vertical TD: 7881 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/19/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/3/2012 | Proposed Top PZ Location: | Sec:32 Twp: 3N 67W | Footage: 2580 FSL 50 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 67W | Footage: 2580 FSL 50 FEL | Proposed Depth/Form: | 8116 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 640 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 448, Top: , Bottom: 640 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8116 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8116 ft. |
| | |
Wellbore Completed | Completion Date: | 10/24/2010 | Spud Date: | 10/20/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8119 ft. | Measured PB depth: | 8071 ft. | True Vertical TD: | 7881 ft. | True Vertical PB depth: | 7833 ft. | Top PZ Location: | Sec:32 Twp: 3N 67W | Footage: 2571 FSL 64 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 67W | Footage: 2581 FSL 65 FEL | Log Types: | PRELIMINARY FORM 5 | Log Types: | GR-CCL-CB-VDL, CD-CN-ML, DI-GL-GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 659 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 659 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1050, Top: 250 ft., Bottom: 8109 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3828 ft. | | | | SUSSEX | 4290 ft. | | | | SHANNON | 4868 ft. | | | | NIOBRARA | 7226 ft. | | | | FORT HAYS | 7495 ft. | | | | CODELL | 7516 ft. | | | | J SAND | 7953 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 12/19/2023 Interval Top: 7226 ft. Interval Bottom: 7538 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/20/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/6/2010 | Treatment Summary: | NB PERF 7226-7414 HOLES 60 SIZE 0.42 CD PERF 7518-7538 HOLES 60 SIZE 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 244,327 gal Slickwater w/ 201,360# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 208,953 gal Slickwater w/ 150,680# 40/70, 4,000# SB Excel.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/23/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 55 | BTU_GAS | 1280 | CALC_BBLS_OIL | 55 | CALC_GOR | 73 | CALC_MCF_GAS | 4 | CASING_PRESS | 1602 | GRAVITY_OIL | 49 | MCF_GAS | 4 |
| Perforation Data: | Interval Top: | 7226 ft. | # Of Holes: | 120 | Interval Bottom: | 7538 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 12/19/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|