Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31528
Well Classification: GW Status: PA - 6/18/2024
Well Name/No:EDITH ANN #4-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/18/2024
FacilityID:416980LocationID:333173
County:WELD #123Location:SESE 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4931 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:495FSL  563 FELLat/Long: 40.118250 / -105.000800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.118212 / -105.000788Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 6/18/2024             Measured TD: 8275 ft.    Vertical TD: 8153 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 6/18/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/3/2012
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1270 FSL  1337 FEL
Bottom Hole Location:Sec:21 Twp: 2N 68W Footage: 1272 FSL  1349 FEL
Proposed Depth/Form:8225 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8225 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7161 ft., Bottom: 8225 ft.

Wellbore Completed
Completion Date:9/1/2010
Spud Date:8/25/2010Spud Date Is:ACTUAL
Measured TD:8275 ft.Measured PB depth:8230 ft.
True Vertical TD:8153 ft.True Vertical PB depth:8108 ft.
Top PZ Location:Sec:21 Twp: 2N 68WFootage: 1270 FSL  1337 FEL
Bottom Hole Location:Sec:21 Twp: 2N 68WFootage: 1272 FSL  1349 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 817 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 473, Top: 0 ft., Bottom: 817 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8261 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 4230 ft., Bottom: 8261 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4500 ft.
NIOBRARA7376 ft.
CODELL7660 ft.
J SAND8090 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/18/2024                 Interval Top: 8100 ft.    Interval Bottom: 8120 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/23/2010
Treatment Summary:JSAND COMPLETION. FRAC'D THE J-SAND WITH 151,788 GAL 18# VISTAR HYBRID CROSS LINKED GELCONTAINING 250,960# 20/40 SAND. 09/23/2010.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8100 ft.# Of Holes:40
Interval Bottom:8120 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/26/2024                 Interval Top: 7660 ft.    Interval Bottom: 7680 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7660 ft.# Of Holes:40
Interval Bottom:7680 ft.Hole Size:

Formation JNBCD                   Formation Classification:                     Status:  CM - 10/24/2010                Interval Top: 7444 ft.    Interval Bottom: 8120 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/23/2010
Treatment Summary:JSND-CDL-NBRR COMMINGLE. SET CBP @ 7404'. 10-18-10. DRILLED OUT CBP @ 7404', CFP @ 7550' AND CFP @ 7760' TO COMMINGLE THE JSND-CDL-NBRR. 10/19/10.
Tubing Size:2.375 in.Tubing Setting Depth:8082 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 92
BBLS_OIL 82
BTU_GAS 1215
CALC_BBLS_H2O 92
CALC_BBLS_OIL 82
CALC_GOR 4561
CALC_MCF_GAS 374
CASING_PRESS 1352
GRAVITY_OIL 52
MCF_GAS 374
TUBING_PRESS 653
Perforation Data:
Interval Top:7444 ft.# Of Holes:160
Interval Bottom:8120 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/18/2024                 Interval Top: 7444 ft.    Interval Bottom: 7680 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/24/2010
Treatment Summary:CDL-NBRR COMPLETION. SET CFP @ 7760'. 099/23/2010. FRAC'D THE CODELL WITH 143,530 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,120 # 30/50 SAND. 09/24/2010. SET CFP @ 7550'. 09/24/2010 FRAC'D THE NIOBRARA WITH 130,242 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,540 # 30/50 SAND. 09/24/2010.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7444 ft.# Of Holes:120
Interval Bottom:7680 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/26/2024                 Interval Top: 7444 ft.    Interval Bottom: 7464 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7444 ft.# Of Holes:80
Interval Bottom:7464 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/18/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No