Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31515
Well Classification: OW Status: SI - 3/1/2023
Well Name/No:Binder #11-10DU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2023
FacilityID:416936LocationID:319109
County:WELD #123Location:SWNW 10 4N67W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1804FNL  345 FWLLat/Long: 40.329310 / -104.885390Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.329280 / -104.885360Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2023             Measured TD: 7490 ft.    Vertical TD: 7310 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/29/2012
Proposed Top PZ Location:Sec:10 Twp: 4N 67W Footage: 659 FNL  661 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67W Footage: 659 FNL  661 FWL
Proposed Depth/Form:7598 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 80, Drill Unit: W2NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 450 ft.
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7598 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 226, Top: 6398 ft., Bottom: 7598 ft.

Wellbore Completed
Completion Date:10/13/2010
Spud Date:10/8/2010Spud Date Is:ACTUAL
Measured TD:7490 ft.Measured PB depth:7445 ft.
True Vertical TD:7310 ft.True Vertical PB depth:7265 ft.
Top PZ Location:Sec:10 Twp: 4N 67WFootage: 637 FNL  643 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67WFootage: 624 FNL  624 FWL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 465 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 465 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7474 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 995, Top: 0 ft., Bottom: 7490 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4180 ft.
SHANNON4748 ft.
NIOBRARA6508 ft.
FORT HAYS6729 ft.
CODELL6803 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 6/13/2011                 Interval Top: 7327 ft.    Interval Bottom: 7335 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2011
Treatment Summary:Frac'd Codell with 477 bbls of slickwater pad, 144 bbls of pHaser 22# pad, 1971 bbls of pHaser 22# fluid system, 217240# of 20/40 Preferd Rock and 8000# of SB Excel 20/40.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7327 ft.# Of Holes:24
Interval Bottom:7335 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 3/1/2023                  Interval Top: 7035 ft.    Interval Bottom: 7335 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/26/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 35
BTU_GAS 1236
CALC_BBLS_H2O 33
CALC_BBLS_OIL 35
CALC_GOR 4401
CALC_MCF_GAS 154
CASING_PRESS 703
GRAVITY_OIL 51
MCF_GAS 154
Perforation Data:
Interval Top:7035 ft.# Of Holes:52
Interval Bottom:7335 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 6/13/2011                 Interval Top: 7035 ft.    Interval Bottom: 7150 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/11/2011
Treatment Summary:Perf'd Niobrara "A" 7035-37'' (4 holes), Niobrara "B" 7142-50' (24 holes), Frac'd Niobrara with 119 bbls of FE-1A Pad, 1550 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2261 bbls of pHaser 20# fluid system, 238460# 20/40 Preferd Rock, 12000# 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7035 ft.# Of Holes:28
Interval Bottom:7150 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
02/28/2023
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No