|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/3/2020 Measured TD: 7686 ft. Vertical TD: 7475 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/3/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/27/2012 | | Proposed Top PZ Location: | Sec:21 Twp: 4N 66W | Footage: 1297 FNL 2543 FEL | | Bottom Hole Location: | Sec:21 Twp: 4N 66W | Footage: 1297 FNL 2543 FEL | | Proposed Depth/Form: | 7626 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 530 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 530 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7626 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 463, Top: , Bottom: 7626 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/12/2012 | | Spud Date: | 1/7/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7686 ft. | Measured PB depth: | 7636 ft. | | True Vertical TD: | 7475 ft. | True Vertical PB depth: | 7425 ft. | | Top PZ Location: | Sec:21 Twp: 4N 66W | Footage: 1317 FNL 2550 FEL | | Bottom Hole Location: | Sec:21 Twp: 4N 66W | Footage: 1326 FNL 2554 FEL | | Log Types: | CBL
Triple Combo
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 608 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 262, Top: 0 ft., Bottom: 608 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7676 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 2150 ft., Bottom: 7676 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3818 ft. | | | | | SUSSEX | 4561 ft. | | | | | SHANNON | 4981 ft. | | | | | NIOBRARA | 7204 ft. | | | | | FORT HAYS | 7437 ft. | | | | | CODELL | 7460 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 6/27/2012 Interval Top: 7461 ft. Interval Bottom: 7477 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/17/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/2012 | | Treatment Summary: | Pumped 227,716 lbs of Ottawa Proppant and 117,196 gallons of 15% HCL, Slick Water and Silverstim.
The Codell is producing through a composite flow through plug
Commingle the Niobrara and Codell |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7461 ft. | # Of Holes: | 64 | | Interval Bottom: | 7477 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/3/2020 Interval Top: 7216 ft. Interval Bottom: 7477 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/17/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7445 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/17/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 11 | | BTU_GAS | 1240 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 17545 | | CALC_MCF_GAS | 193 | | CASING_PRESS | 740 | | GRAVITY_OIL | 61 | | MCF_GAS | 193 | | TUBING_PRESS | 280 |
| | Perforation Data: | | Interval Top: | 7216 ft. | # Of Holes: | 112 | | Interval Bottom: | 7477 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/27/2012 Interval Top: 7216 ft. Interval Bottom: 7309 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/17/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/2012 | | Treatment Summary: | Pumped 241,863 lbs of Ottawa Proppant and 154,355 gallons of Slick Water and Silverstim
Commingle the Niobrara and Codell |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7216 ft. | # Of Holes: | 48 | | Interval Bottom: | 7309 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/03/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|