|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/27/2018 Measured TD: 8149 ft. Vertical TD: 8043 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/27/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/7/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 1300 FNL 50 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 1300 FNL 50 FEL | | Proposed Depth/Form: | 8074 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 6/27/2010 | | Spud Date: | 6/20/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8149 ft. | Measured PB depth: | 8085 ft. | | True Vertical TD: | 8043 ft. | True Vertical PB depth: | 7979 ft. | | Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 1178 FNL 106 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 1176 FNL 114 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 327, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8114 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 6733 ft., Bottom: 8114 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5235 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 3840 ft., Bottom: 5235 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5235 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 3840 ft., Bottom: 5235 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4502 ft. | | | | | NIOBRARA | 7322 ft. | | | | | CODELL | 7562 ft. | | | | | J SAND | 7940 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/14/2019 Interval Top: 7964 ft. Interval Bottom: 7984 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/14/2010 | | Treatment Summary: | J SAND COMPLETION: FRAC J-SAND WITH 153,216 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,060# 20/40 SAND 07-14-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7964 ft. | # Of Holes: | 40 | | Interval Bottom: | 7984 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/14/2010 Interval Top: 7382 ft. Interval Bottom: 7984 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/6/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE: SET CBP @ 7310'. 7-21-10. DRILLED OUT CBP@ 7310', CFP @ 7500' AND 7670' TO COMMINGLE THE JSND-NBRR-CDL. 7-22-10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7931 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/6/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 100 | | BTU_GAS | 1203 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 2500 | | CALC_MCF_GAS | 250 | | CASING_PRESS | 1825 | | GRAVITY_OIL | 51 | | MCF_GAS | 250 | | TUBING_PRESS | 1123 |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 152 | | Interval Bottom: | 7984 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/14/2019 Interval Top: 7382 ft. Interval Bottom: 7578 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/14/2010 | | Treatment Summary: | CDL-NBRR COMPLETION: SET CFP @ 7670'. 07-14-10. FRAC THE CODELL WITH 108,780 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,020# 20/40 SAND. 07-14-10. SET CFP @ 7500'. 07-14-10. FRAC'D THE NIOBRARA WITH 132,048 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,020# 20/40 SAND. 07-14-10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 112 | | Interval Bottom: | 7578 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/14/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|