|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 2/1/2026 Measured TD: 8400 ft. Vertical TD: 7395 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 2/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/7/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 1300 FNL 2550 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 1300 FNL 2550 FWL | | Proposed Depth/Form: | 8364 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8364 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7321 ft., Bottom: 8364 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/25/2010 | | Spud Date: | 7/18/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8361 ft. | | True Vertical TD: | 7395 ft. | True Vertical PB depth: | 7896 ft. | | Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 1282 FNL 2541 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 1280 FNL 2537 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 843 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 304, Top: 0 ft., Bottom: 843 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8392 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 4750 ft., Bottom: 8392 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4766 ft. | | | | | NIOBRARA | 7538 ft. | | | | | CODELL | 7818 ft. | | | | | J SAND | 8268 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 2/1/2026 Interval Top: 8282 ft. Interval Bottom: 8302 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/5/2010 | | Treatment Summary: | J SAND COMPLETION: FRAC'D THE J-SAND WITH 152,249 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,160# 20/40 SAND 08-05-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8282 ft. | # Of Holes: | 40 | | Interval Bottom: | 8302 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/5/2026 Interval Top: 7818 ft. Interval Bottom: 7836 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7818 ft. | # Of Holes: | 36 | | Interval Bottom: | 7836 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/29/2010 Interval Top: 7592 ft. Interval Bottom: 8302 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/29/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE: SET CBP @ 75200'. 8-18-10. DRILLED OUT CBP@ 7520', CFP @ 7730' AND CFP @ 7930' TO COMMINGLE THE JSND-NBRR-CDL. 8-19-10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8263 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/29/2010 | Test Method: | FLOWING | | Hours Tested: | 23 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 88 | | BBLS_OIL | 107 | | BTU_GAS | 1360 | | CALC_BBLS_H2O | 92 | | CALC_BBLS_OIL | 112 | | CALC_GOR | 4366 | | CALC_MCF_GAS | 489 | | CASING_PRESS | 1575 | | GRAVITY_OIL | 51 | | MCF_GAS | 469 | | TUBING_PRESS | 990 |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 156 | | Interval Bottom: | 8302 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 2/1/2026 Interval Top: 7592 ft. Interval Bottom: 7836 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 116 | | Interval Bottom: | 7836 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/5/2026 Interval Top: 7592 ft. Interval Bottom: 7612 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 80 | | Interval Bottom: | 7612 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 01/29/2025 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|