|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/2/2025 Measured TD: 8245 ft. Vertical TD: 8081 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/2/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/5/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 100 FSL 1369 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 103 FSL 1371 FEL | | Proposed Depth/Form: | 8189 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: 2:S2SE 11:N2NE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: 2:S2SE 11:N2NE | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: 2:S2SE 11:N2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 840 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 840 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8189 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7142 ft., Bottom: 8189 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/24/2011 | | Spud Date: | 10/18/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8245 ft. | Measured PB depth: | 8180 ft. | | True Vertical TD: | 8081 ft. | True Vertical PB depth: | 8016 ft. | | Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 100 FSL 1369 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 103 FSL 1371 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 888 ft., Weight: J-55 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 888 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8232 ft., Weight: I-80 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 3640 ft., Bottom: 8232 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4664 ft. | | | | | NIOBRARA | 7371 ft. | | | | | CODELL | 7645 ft. | | | | | J SAND | 8090 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/2/2025 Interval Top: 8090 ft. Interval Bottom: 8150 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/28/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/2011 | | Treatment Summary: | Frac'd the J-Sand 8090’– 8150’, (52 holes) w/ 67,830 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,000# 20/40 Sand. 11-03-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8090 ft. | # Of Holes: | 52 | | Interval Bottom: | 8150 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/25/2024 Interval Top: 7645 ft. Interval Bottom: 7664 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/28/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/2011 | | Treatment Summary: | Set CFP @ 7700'. 11-03-11.
Frac'd the Codell 7645’ – 7664’, (38 holes) w/ 93,408 gal 22 # pHaserFrac Hybrid cross
linked gel containing 250,340 # 20/40 sand. 11-03-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7645 ft. | # Of Holes: | 38 | | Interval Bottom: | 7664 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 2/4/2012 Interval Top: 7410 ft. Interval Bottom: 8150 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/28/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/4/2012 | | Treatment Summary: | Set CBP @ 7150'. 01-25-12. Drilled out CBP @ 7150', CFP @ 7480'. 01-26-12
Drilled out CFP @ 7700' to commingle the JSND-NBRR-CDL. 01-27-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8078 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 65 | | BTU_GAS | 1249 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 1846 | | CALC_MCF_GAS | 120 | | CASING_PRESS | 1276 | | GRAVITY_OIL | 50 | | MCF_GAS | 120 | | TUBING_PRESS | 397 |
| | Perforation Data: | | Interval Top: | 7410 ft. | # Of Holes: | 174 | | Interval Bottom: | 8150 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/2/2025 Interval Top: 7410 ft. Interval Bottom: 7664 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/28/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7410 ft. | # Of Holes: | 122 | | Interval Bottom: | 7664 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/25/2024 Interval Top: 7410 ft. Interval Bottom: 7431 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/28/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/2011 | | Treatment Summary: | Set CFP @ 7480'. 11-03-11. Frac'd the Niobrara 7410’ – 7431’ (84 holes), w/ 101,514 gals 18 # pHaserFrac
Hybrid cross linked gel containing 250,600# 30/50 sand. 11-03-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7410 ft. | # Of Holes: | 84 | | Interval Bottom: | 7431 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/02/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|