Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31336
Well Classification: OW Status: PA - 2/11/2019
Well Name/No:NRC #22-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/11/2019
FacilityID:416327LocationID:318831
County:WELD #123Location:SWNW 9 1N67W 6
Field:SPINDLE - #77900Elevation:5021 ft.
Planned Location:1320FNL  1210 FWLLat/Long: 40.069139 / -104.900790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.069145 / -104.900797Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/11/2011
End Date: 1/11/2011
Reported: 4/13/2011
Prior to rule 205A.b.(2)(A)
Days to report: 92
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/11/2019             Measured TD: 8431 ft.    Vertical TD: 8264 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/11/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/20/2012
Prop Depth/Form:8475 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: S/2NW/4, N/2SW/4
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: S/2NW/4, N/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 690, Top: 0 ft., Bottom: 985 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8475 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8475 ft.

Wellbore Completed
Completion Date:8/8/2010
Spud Date:8/3/2010Spud Date Is:ACTUAL
Measured TD:8431 ft.Measured PB depth:8387 ft.
True Vertical TD:8264 ft.True Vertical PB depth:8220 ft.
Top PZ Location:Sec:9 Twp: 1N 67WFootage: 2585 FNL  1311 FWLDepth
Bottom Hole Location:Sec:9 Twp: 1N 67WFootage: 2584 FNL  1313 FWLDepth
Log Types:PRELIMINARY FORM 5
Log Types:CD-CN-ML, DI-GL-GR; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 0 ft., Bottom: 1000 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8403 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 6970 ft., Bottom: 8403 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5843 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 1150 ft., Bottom: 5500 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5835 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 1148 ft., Bottom: 5900 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1148 ft., Depth: 5835 ft., Bottom: 5900 ft., Sacks: 675, Method: DV TOOL
Additional Cement:String Type: S.C. 1.1 , Top: 5500 ft., Depth: 8403 ft., Bottom: 8403 ft., Sacks: 120, Method: DV TOOL
Additional Cement:String Type: S.C. 1.2 , Top: 899 ft., Depth: 5843 ft., Bottom: 5500 ft., Sacks: 675, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4323 ft.
SUSSEX4698 ft.
NIOBRARA7505 ft.
FORT HAYS7816 ft.
CODELL7836 ft.
J SAND8274 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/11/2019                 Interval Top: 8283 ft.    Interval Bottom: 8306 ft.

 Completed Information for Formation J SAND
1st Production Date:3/1/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 150,654 gal Slickwater w/ 116,020# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8283 ft.# Of Holes:58
Interval Bottom:8306 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/6/2019                  Interval Top: 7838 ft.    Interval Bottom: 7856 ft.

 Completed Information for Formation CODELL
1st Production Date:3/1/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/6/2019Treatment End Date:N/A
Treatment Summary:CD Perf 7838-7856 Holes 54 Size 0.38
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7838 ft.# Of Holes:54
Interval Bottom:7856 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/15/2011                 Interval Top: 7612 ft.    Interval Bottom: 8306 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:3/1/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2011
Treatment Summary:NB Perf 7612-7710 Holes 72 Size 0.42 CD Perf 7838-7856 Holes 54 Size 0.38 J S Perf 8283-8306 Holes 58 Size 0.42
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 64
BTU_GAS 1135
CALC_BBLS_OIL 64
CALC_GOR 1531
CALC_MCF_GAS 98
CASING_PRESS 461
GRAVITY_OIL 42
MCF_GAS 98
Perforation Data:
Interval Top:7612 ft.# Of Holes:184
Interval Bottom:8306 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/11/2019                 Interval Top: 7612 ft.    Interval Bottom: 7856 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/1/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/6/2019Treatment End Date:N/A
Treatment Summary:NB Perf 7612-7710 Holes 72 Size 0.42 CD Perf 7838-7856 Holes 54 Size 0.38
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/11/2011
Treatment Summary:NB Perf 7612-7710 Holes 72 Size 0.42 CD Perf 7838-7856 Holes 54 Size 0.38 Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 231,294 gal Slickwater w/ 201,120# 40/70, 4,000# SB Excel Frac Codell down 4-1/2" Csg w/ 193,872 gal Slickwater w/ 150,400# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7612 ft.# Of Holes:126
Interval Bottom:7856 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 6/6/2019                  Interval Top: 7612 ft.    Interval Bottom: 7710 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/1/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/6/2019Treatment End Date:N/A
Treatment Summary:NB Perf 7612-7710 Holes 72 Size 0.42
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7612 ft.# Of Holes:72
Interval Bottom:7710 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No