|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/11/2019 Measured TD: 8431 ft. Vertical TD: 8264 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/11/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/20/2012 | Prop Depth/Form: | 8475 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: S/2NW/4, N/2SW/4 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: S/2NW/4, N/2SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 690, Top: 0 ft., Bottom: 985 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8475 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8475 ft. |
| | |
Wellbore Completed | Completion Date: | 8/8/2010 | Spud Date: | 8/3/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8431 ft. | Measured PB depth: | 8387 ft. | True Vertical TD: | 8264 ft. | True Vertical PB depth: | 8220 ft. | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 2585 FNL 1311 FWL | Depth | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 2584 FNL 1313 FWL | Depth | Log Types: | PRELIMINARY FORM 5 | Log Types: | CD-CN-ML, DI-GL-GR; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1000 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8403 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 120, Top: 6970 ft., Bottom: 8403 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5843 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 675, Top: 1150 ft., Bottom: 5500 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5835 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 675, Top: 1148 ft., Bottom: 5900 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1148 ft., Depth: 5835 ft., Bottom: 5900 ft., Sacks: 675, Method: DV TOOL | Additional Cement: | String Type: S.C. 1.1 , Top: 5500 ft., Depth: 8403 ft., Bottom: 8403 ft., Sacks: 120, Method: DV TOOL | Additional Cement: | String Type: S.C. 1.2 , Top: 899 ft., Depth: 5843 ft., Bottom: 5500 ft., Sacks: 675, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4323 ft. | | | | SUSSEX | 4698 ft. | | | | NIOBRARA | 7505 ft. | | | | FORT HAYS | 7816 ft. | | | | CODELL | 7836 ft. | | | | J SAND | 8274 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/11/2019 Interval Top: 8283 ft. Interval Bottom: 8306 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/3/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 150,654 gal Slickwater w/ 116,020# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8283 ft. | # Of Holes: | 58 | Interval Bottom: | 8306 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/6/2019 Interval Top: 7838 ft. Interval Bottom: 7856 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/6/2019 | Treatment End Date: | N/A | Treatment Summary: | CD Perf 7838-7856 Holes 54 Size 0.38 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7838 ft. | # Of Holes: | 54 | Interval Bottom: | 7856 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/15/2011 Interval Top: 7612 ft. Interval Bottom: 8306 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/3/2011 | Treatment Summary: | NB Perf 7612-7710 Holes 72 Size 0.42
CD Perf 7838-7856 Holes 54 Size 0.38
J S Perf 8283-8306 Holes 58 Size 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/15/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 64 | BTU_GAS | 1135 | CALC_BBLS_OIL | 64 | CALC_GOR | 1531 | CALC_MCF_GAS | 98 | CASING_PRESS | 461 | GRAVITY_OIL | 42 | MCF_GAS | 98 |
| Perforation Data: | Interval Top: | 7612 ft. | # Of Holes: | 184 | Interval Bottom: | 8306 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/11/2019 Interval Top: 7612 ft. Interval Bottom: 7856 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/6/2019 | Treatment End Date: | N/A | Treatment Summary: | NB Perf 7612-7710 Holes 72 Size 0.42
CD Perf 7838-7856 Holes 54 Size 0.38 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 1/11/2011 | Treatment Summary: | NB Perf 7612-7710 Holes 72 Size 0.42 CD Perf 7838-7856 Holes 54 Size 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 231,294 gal Slickwater w/ 201,120# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 193,872 gal Slickwater w/ 150,400# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7612 ft. | # Of Holes: | 126 | Interval Bottom: | 7856 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 6/6/2019 Interval Top: 7612 ft. Interval Bottom: 7710 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/6/2019 | Treatment End Date: | N/A | Treatment Summary: | NB Perf 7612-7710 Holes 72 Size 0.42 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7612 ft. | # Of Holes: | 72 | Interval Bottom: | 7710 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|