|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/8/2019 Measured TD: 8615 ft. Vertical TD: 8515 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/8/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/14/2014 | Prop Depth/Form: | 8615 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NW/4 | Casing: | String Type: SURF, Hole Size: 112.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1011 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1011 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8598 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 150, Top: 6650 ft., Bottom: 8369 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5672 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 690, Top: 580 ft., Bottom: 5720 ft. |
| | |
Wellbore Completed | Completion Date: | 8/3/2010 | Spud Date: | 7/30/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8615 ft. | Measured PB depth: | 8560 ft. | True Vertical TD: | 8515 ft. | True Vertical PB depth: | 8460 ft. | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 666 FNL 1977 FWL | Depth | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 669 FNL 1979 FWL | Depth | Log Types: | PRELIMINARY FORM 5 | Log Types: | CD-CN-ML, DI-GL-GR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1012 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1012 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8598 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 6650 ft., Bottom: 8598 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5672 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 690, Top: 580 ft., Bottom: 5720 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 250 ft., Depth: 5672 ft., Bottom: 5720 ft., Sacks: 690, Method: DV TOOL | Additional Cement: | String Type: S.C. 1.1 , Top: 6650 ft., Depth: 8598 ft., Bottom: 8598 ft., Sacks: 150, Method: DV TOOL | Additional Cement: | String Type: S.C. 1.2 , Top: 580 ft., Depth: 5670 ft., Bottom: 5670 ft., Sacks: 690, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4254 ft. | | | | SUSSEX | 4735 ft. | | | | SHANNON | 5240 ft. | | | | NIOBRARA | 7459 ft. | | | | FORT HAYS | 7750 ft. | | | | CODELL | 7772 ft. | | | | J SAND | 8213 ft. | | | | DAKOTA | 8390 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 2/8/2019 Interval Top: 8392 ft. Interval Bottom: 8426 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 12/2/2010 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/31/2012 | Treatment Summary: | SET CIBP AT 8347 WITH CMT CAP | Formation Treatment | Treatment Date: | 11/18/2010 | Treatment Summary: | Frac Dakota down 2 7/8" tbg w/455 bbl fresh water containing 9400# 100 mesh sand, 49,040# 20/40 sand and 8200# 20/40 SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1116 | CALC_MCF_GAS | 18 | CASING_PRESS | 180 | GRAVITY_OIL | 40 | MCF_GAS | 18 |
| Perforation Data: | Interval Top: | 8392 ft. | # Of Holes: | 54 | Interval Bottom: | 8426 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/17/2012 Interval Top: 7774 ft. Interval Bottom: 7792 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/15/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/11/2012 | Treatment End Date: | 6/11/2012 | Treatment Summary: | PERF CODL 7774-7792 HOLES 54 SIZE .38
Frac CODL down 4.5" casing w/ 197,988 gal slickwater w/ 150,420# 40/70, 4,000# 20/40.
Broke @ 4,346 psi @ 3.1 bpm. ATP=3,880 psi; MTP=5,550 psi; ATR=59.0 bpm; ISDP=2,471 psi | Total fluid used in treatment (bbls): | 4714 | Max pressure during treatment (psi): | 5550 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 154420 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7774 ft. | # Of Holes: | 54 | Interval Bottom: | 7792 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/8/2019 Interval Top: 7548 ft. Interval Bottom: 7792 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/15/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7722 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/25/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 95 | BTU_GAS | 1217 | CALC_BBLS_OIL | 95 | CALC_GOR | 1463 | CALC_MCF_GAS | 139 | CASING_PRESS | 1750 | GRAVITY_OIL | 51 | MCF_GAS | 139 | TUBING_PRESS | 1550 |
| Perforation Data: | Interval Top: | 7548 ft. | # Of Holes: | 114 | Interval Bottom: | 7792 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/17/2012 Interval Top: 7548 ft. Interval Bottom: 7638 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/15/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/11/2012 | Treatment End Date: | 6/11/2012 | Treatment Summary: | PERF NBRR 7548-7638 HOLES 60 SIZE .42
Frac NBRR down 4.5" casing w/ 235 gal 15% HCl & 248,909 gal slickwater w/ 201,960# 40/70, 4,000# 20/40. Broke @ 2,827 psi @ 6.1 bpm. ATP=4,156 psi; MTP=5,082 psi; ATR=61.0 bpm; ISDP=2,615 psi
| Total fluid used in treatment (bbls): | 4926 | Max pressure during treatment (psi): | 5082 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 205960 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7548 ft. | # Of Holes: | 60 | Interval Bottom: | 7638 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|