|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/11/2022 Measured TD: 8414 ft. Vertical TD: 8306 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/11/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/9/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 65 FSL 1280 FWL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 67 FSL 1290 FWL | | Proposed Depth/Form: | 8418 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8418 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8418 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/29/2010 | | Spud Date: | 6/25/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8414 ft. | Measured PB depth: | 8364 ft. | | True Vertical TD: | 8306 ft. | True Vertical PB depth: | 8256 ft. | | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 65 FSL 1280 FWL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 67 FSL 1290 FWL | | Log Types: | | | Log Types: | GR-CCL-CB-VDL; PE/CD-CN-ML, DI-GL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1017 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1017 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8397 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 1470 ft., Bottom: 8397 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4300 ft. | | | | | SUSSEX | 4806 ft. | | | | | SHANNON | 5303 ft. | | | | | NIOBRARA | 7474 ft. | | | | | FORT HAYS | 7799 ft. | | | | | CODELL | 7821 ft. | | | | | J SAND | 8266 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/11/2022 Interval Top: 8276 ft. Interval Bottom: 8302 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/20/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/23/2010 | | Treatment Summary: | Frac JSND w/ 147,126 gal SW & 116,700# 40/70 sand & 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1135 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 8276 ft. | # Of Holes: | 78 | | Interval Bottom: | 8302 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/11/2022 Interval Top: 7594 ft. Interval Bottom: 7842 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/20/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/27/2010 | | Treatment Summary: | NBRR Perf 7594-7696 Holes 72 Size 0.47 CODL Perf 7824-7842 Holes 54 Size 0.42
Frac NBRR w/ 250 gal 15% HCl & 240,746 gal SW & 200,420# 30/50 sand & 4,000# SuperLC.
Frac CODL w/ 203,406 gal SW & 150,720# 30/50 sand & 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | BTU_GAS | 1135 | | CALC_BBLS_OIL | 5 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7594 ft. | # Of Holes: | 126 | | Interval Bottom: | 7842 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/11/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|