|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/3/2025 Measured TD: 8075 ft. Vertical TD: 7969 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/3/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/6/2012 | | Proposed Top PZ Location: | Sec:36 Twp: 5N 67W | Footage: 1320 FNL 1305 FWL | | Bottom Hole Location: | Sec:36 Twp: 5N 67W | Footage: 1320 FNL 1305 FWL | | Proposed Depth/Form: | 8064 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8064 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8064 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/15/2010 | | Spud Date: | 7/12/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8075 ft. | Measured PB depth: | 8024 ft. | | True Vertical TD: | 7969 ft. | True Vertical PB depth: | 7918 ft. | | Top PZ Location: | Sec:36 Twp: 5N 67W | Footage: 1339 FNL 1294 FWL | | Bottom Hole Location: | Sec:36 Twp: 5N 67W | Footage: 1343 FNL 1300 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | P/E AILC-CNDL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8069 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 980, Top: 914 ft., Bottom: 8069 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3812 ft. | | | | | SUSSEX | 4430 ft. | | | | | SHANNON | 4818 ft. | | | | | NIOBRARA | 7155 ft. | | | | | FORT HAYS | 7456 ft. | | | | | CODELL | 7478 ft. | | | | | J SAND | 7932 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/3/2025 Interval Top: 7950 ft. Interval Bottom: 7982 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/10/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/14/2010 | | Treatment Summary: | Frac J-Sand w/ 168,147 gal Slickwater w/ 160,940# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/23/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1267 | | CALC_MCF_GAS | 1 | | CASING_PRESS | 2750 | | GRAVITY_OIL | 40 | | MCF_GAS | 1 |
| | Perforation Data: | | Interval Top: | 7950 ft. | # Of Holes: | 66 | | Interval Bottom: | 7982 ft. | Hole Size: | 0.48 in. |
|
Formation CODL Formation Classification: Status: CM - 10/1/2020 Interval Top: 7478 ft. Interval Bottom: 7498 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7478 ft. | # Of Holes: | 60 | | Interval Bottom: | 7498 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/3/2025 Interval Top: 7168 ft. Interval Bottom: 7498 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/10/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/20/2010 | | Treatment Summary: | Perf NB 7168-7362 Holes 62 Size 0.38 Perf CD 7478-7498 Holes 60 Size 0.38
Frac Niobrara w/ 250 gal 15% HCl & 248,596 gal Slickwater w/ 200,360# 40/70, 4,220# SB Excel.
Frac Codell w/ 200,424 gal Slickwater w/ 150,160# 40/70, 4,080# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/23/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 31 | | BTU_GAS | 1267 | | CALC_BBLS_OIL | 31 | | CALC_GOR | 3323 | | CALC_MCF_GAS | 103 | | CASING_PRESS | 2750 | | GRAVITY_OIL | 40 | | MCF_GAS | 103 |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 122 | | Interval Bottom: | 7498 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: Status: CM - 10/1/2020 Interval Top: 7168 ft. Interval Bottom: 7362 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 62 | | Interval Bottom: | 7362 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/03/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 182 |
| Total Gas Produced (MCF) | 3911 |
| GOR | 21489 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.369 |
| Average MCFE per Day | 13.744 |
| Federal Financial Assurance | i | |
|
|