|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/2/2020 Measured TD: 7940 ft. Vertical TD: 7705 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/2/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/10/2012 | Proposed Top PZ Location: | Sec:32 Twp: 3N 64W | Footage: 1320 FSL 2565 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 64W | Footage: 1320 FSL 2565 FEL | Proposed Depth/Form: | 7914 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: E/2SW/4, W/2SE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: E/2SW/4, W/2SE/4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: E/2SW/4, W/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 292, Top: 0 ft., Bottom: 700 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7914 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 756, Top: , Bottom: 7914 ft. |
| | |
Wellbore Completed | Completion Date: | 7/13/2011 | Spud Date: | 7/8/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7940 ft. | Measured PB depth: | 7885 ft. | True Vertical TD: | 7705 ft. | True Vertical PB depth: | 7650 ft. | Top PZ Location: | Sec:32 Twp: 3N 64W | Footage: 1312 FSL 2521 FWL | Bottom Hole Location: | Sec:32 Twp: 3N 64W | Footage: 1317 S 2514 W | Log Types: | CBL/GRL?CCL, SDL/DSNL/ACL/TRL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 808 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7930 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 675, Top: 1780 ft., Bottom: 7930 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7024 ft. | | | | FORT HAYS | 7280 ft. | | | | CODELL | 7304 ft. | | | | GREENHORN | 7391 ft. | | | | D SAND | 7697 ft. | | | | MOWRY | 7742 ft. | | | | J SAND | 7753 ft. | | | |
Formation JSND Formation Classification: Status: AB - 10/2/2020 Interval Top: 7754 ft. Interval Bottom: 7814 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/3/2011 | Choke Size: | 0.000 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/27/2011 | Treatment Summary: | Frac'd the J-Sand W/ 148231 gals of Slverstim and Slick Water with 283,180#'s of Ottawa sand.
The J-Sand is producing through a Cast Iron Flow Through Plug.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/9/2011 | Test Method: | FLOWING | Hours Tested: | 22 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 92 | BTU_GAS | 1267 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 92 | CALC_GOR | 3010 | CALC_MCF_GAS | 277 | CASING_PRESS | 840 | GRAVITY_OIL | 50 | MCF_GAS | 277 |
| Perforation Data: | Interval Top: | 7754 ft. | # Of Holes: | 56 | Interval Bottom: | 7814 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: Status: AB - 10/2/2020 Interval Top: 7095 ft. Interval Bottom: 7313 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/3/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/27/2011 | Treatment Summary: | FRAC'D NIOBRARA-CODELL W/275513 GALS OF SILVERSTIM AND SLICK WATER WITH 495,200#'S OF OTTAWA SAND. COMMINGLE THE NIOBRARA AND CODELL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/9/2011 | Test Method: | FLOWING | Hours Tested: | 22 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 92 | BTU_GAS | 1267 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 92 | CALC_GOR | 3010 | CALC_MCF_GAS | 277 | CASING_PRESS | 840 | GRAVITY_OIL | 50 | MCF_GAS | 277 |
| Perforation Data: | Interval Top: | 7095 ft. | # Of Holes: | 80 | Interval Bottom: | 7313 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 10/02/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|