|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/11/2019 Measured TD: 8150 ft. Vertical TD: 8030 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/11/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/18/2012 | | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 95 FSL 1264 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 95 FSL 1262 FEL | | Proposed Depth/Form: | 8092 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8092 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7057 ft., Bottom: 8092 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5114 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4093 ft., Bottom: 5114 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/27/2010 | | Spud Date: | 7/23/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8150 ft. | Measured PB depth: | 8028 ft. | | True Vertical TD: | 8030 ft. | True Vertical PB depth: | 7908 ft. | | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 95 FSL 1264 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 95 FSL 1262 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 697 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8114 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 2600 ft., Bottom: 8114 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4970 ft. | | | | | NIOBRARA | 7326 ft. | | | | | CODELL | 7580 ft. | | | | | J SAND | 8011 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/11/2019 Interval Top: 8011 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/18/2010 | | Treatment Summary: | J SAND COMPLETION: FRAC J-SAND WITH 155,190 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,760# 20/40 SAND 08-18-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8011 ft. | # Of Holes: | 62 | | Interval Bottom: | 8048 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/22/2010 Interval Top: 7366 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/22/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE: SET CBP @ 7250'. 8-23-10. DRILLED OUT CBP@ 7250', CFP @ 7490' AND CFP @ 7700' TO COMMINGLE THE JSND-NBRR-CDL. 8-24-10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8004 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/22/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 114 | | BBLS_OIL | 91 | | BTU_GAS | 1163 | | CALC_BBLS_H2O | 114 | | CALC_BBLS_OIL | 91 | | CALC_GOR | 2967 | | CALC_MCF_GAS | 270 | | CASING_PRESS | 768 | | GRAVITY_OIL | 58 | | MCF_GAS | 270 |
| | Perforation Data: | | Interval Top: | 7366 ft. | # Of Holes: | 182 | | Interval Bottom: | 8048 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/11/2019 Interval Top: 7366 ft. Interval Bottom: 7600 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/18/2010 | | Treatment Summary: | CDL-NBRR COMPLETION: SET CFP @ 7700'. 08-18-10. FRAC CODELL WITH 109,158 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,080# 30/50 SAND. 08-18-10. SET CFP @ 7490'. 08-18-10. FRAC NIOBRARA WITH 131,670 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,140# 30/50 SAND. 08-18-10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7366 ft. | # Of Holes: | 120 | | Interval Bottom: | 7600 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/11/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|