|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/6/2023 Measured TD: 8190 ft. Vertical TD: 8183 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/6/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/22/2011 | Proposed Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 2600 FNL 2580 FEL | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 2600 FNL 2580 FEL | Proposed Depth/Form: | 8104 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1050 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1050 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8104 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8104 ft. |
| | |
Wellbore Completed | Completion Date: | 8/17/2010 | Spud Date: | 8/14/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8190 ft. | Measured PB depth: | 8131 ft. | True Vertical TD: | 8183 ft. | True Vertical PB depth: | 8124 ft. | Top PZ Location: | Sec:36 Twp: 1N 68W | Footage: 2584 FNL 2579 FEL | Bottom Hole Location: | Sec:36 Twp: 1N 68W | Footage: 2576 FNL 2572 FEL | Log Types: | Preliminary Form 5 | Log Types: | CD-CN-ML, DI-GL-GR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1131 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8162 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 985, Top: 962 ft., Bottom: 8162 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5012 ft. | | | | SHANNON | 5550 ft. | | | | NIOBRARA | 7506 ft. | | | | FORT HAYS | 7940 ft. | | | | CODELL | 7962 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/6/2023 Interval Top: 7534 ft. Interval Bottom: 7980 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/5/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/29/2010 | Treatment Summary: | NB Perf 7534-7824 Holes 64 Size 0.42 CD Perf 7962-7980 Holes 54 Size 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 241,038 gal Slickwater w/ 200,380# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 208,698 gal Slickwater w/ 150,160# 40/70, 4,000# SB Excel |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7926 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/21/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 5 | BTU_GAS | 1336 | CALC_BBLS_OIL | 5 | CALC_GOR | 70000 | CALC_MCF_GAS | 350 | CASING_PRESS | 634 | GRAVITY_OIL | 47 | MCF_GAS | 350 | TUBING_PRESS | 246 |
| Perforation Data: | Interval Top: | 7534 ft. | # Of Holes: | 118 | Interval Bottom: | 7980 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 07/06/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|