|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/12/2024 Measured TD: 9075 ft. Vertical TD: 8512 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/12/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/21/2011 | | Proposed Top PZ Location: | Sec:16 Twp: 1N 68W | Footage: 1964 FNL 643 FEL | | Bottom Hole Location: | Sec:16 Twp: 1N 68W | Footage: 1989 FNL 587 FEL | | Proposed Depth/Form: | 9157 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1020 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 714, Top: , Bottom: 1020 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9157 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 9157 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/10/2010 | | Spud Date: | 5/6/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 9075 ft. | Measured PB depth: | 9055 ft. | | True Vertical TD: | 8512 ft. | True Vertical PB depth: | 8492 ft. | | Top PZ Location: | Sec:16 Twp: 1N 68W | Footage: 1964 FNL 643 FEL | | Bottom Hole Location: | Sec:16 Twp: 1N 68W | Footage: 1989 FNL 587 FEL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | CD-CN-ML, DI-GL-GR, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1064 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 0 ft., Bottom: 1064 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9055 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1110, Top: 2590 ft., Bottom: 9055 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 1020 ft., Bottom: 1550 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4602 ft. | 4660 ft. | | | | SUSSEX | 5050 ft. | 5396 ft. | | | | SHANNON | 5698 ft. | 5772 ft. | | | | NIOBRARA | 8130 ft. | | | | | FORT HAYS | 8482 ft. | | | | | CODELL | 8500 ft. | | | | | J SAND | 8895 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/12/2024 Interval Top: 8130 ft. Interval Bottom: 8522 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/29/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/4/2010 | | Treatment Summary: | NBRR PERF 8130-8380 HOLES 62 SIZE 0.42 CODL PERF 8502-8522 HOLES 60 SIZE 0.42 FRAC NBRR W/504 GAL 15% HCL & 246,540 GAL SW & 200,340# 40/70 SAND & 4,000# SB EXCEL. FRAC CODL W/198,240 GAL SW & 150,640# 40/70 SAND & 4,000# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/4/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1313 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 533 | | CALC_MCF_GAS | 8 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 49 |
| | Perforation Data: | | Interval Top: | 8130 ft. | # Of Holes: | 122 | | Interval Bottom: | 8522 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/12/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|