|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/11/2024 Measured TD: 7844 ft. Vertical TD: 7761 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/11/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/10/2011 | | Proposed Top PZ Location: | Sec:32 Twp: 5N 65W | Footage: 2575 FSL 75 FEL | | Bottom Hole Location: | Sec:32 Twp: 5N 65W | Footage: 2575 FSL 75 FEL | | Proposed Depth/Form: | 7769 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 226, Top: 0 ft., Bottom: 525 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7769 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 735, Top: , Bottom: 7769 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/13/2010 | | Spud Date: | 2/8/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7844 ft. | Measured PB depth: | 7782 ft. | | True Vertical TD: | 7761 ft. | True Vertical PB depth: | 7699 ft. | | Top PZ Location: | Sec:32 Twp: 5N 65W | Footage: 2584 FSL 68 FEL | | Bottom Hole Location: | Sec:32 Twp: 5N 65W | Footage: 2585 FSL 64 FEL | | Log Types: | CBL/GR/CCL, PEL/AIL/LCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 573 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 399, Top: 0 ft., Bottom: 573 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7827 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 6218 ft., Bottom: 7827 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5502 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 1810 ft., Bottom: 5502 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6827 ft. | | | | | FORT HAYS | 7128 ft. | | | | | CODELL | 7151 ft. | | | | | GREENHORN | 7237 ft. | | | | | MOWRY | 7604 ft. | | | | | J SAND | 7623 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/27/2023 Interval Top: 7630 ft. Interval Bottom: 7644 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/26/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2010 | | Treatment Summary: | FRAC'D J-SAND W/148741 GALS OF SILVERSTIM AND SLICKWATER WITH 282,000 #'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7630 ft. | # Of Holes: | 56 | | Interval Bottom: | 7644 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 5/21/2012 Interval Top: 7152 ft. Interval Bottom: 7166 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/26/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/3/2010 | | Treatment Summary: | FRAC'D CODELL W/133600 GALS OF SILVERSTIM AND SLICKWATER WITH 270,680 #'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7152 ft. | # Of Holes: | 56 | | Interval Bottom: | 7166 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/9/2010 Interval Top: 6850 ft. Interval Bottom: 7644 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/9/2010 | | Treatment Summary: | COMMINGLE NIOBRARA/CODELL/J-SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/9/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 3 | | BTU_GAS | 1303 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 39333 | | CALC_MCF_GAS | 118 | | CASING_PRESS | 1325 | | GRAVITY_OIL | 50 | | MCF_GAS | 118 | | TUBING_PRESS | 1300 |
| | Perforation Data: | | Interval Top: | 6850 ft. | # Of Holes: | 160 | | Interval Bottom: | 7644 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/27/2023 Interval Top: 6850 ft. Interval Bottom: 7166 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/17/2013 | Treatment End Date: | N/A | | Treatment Summary: | COMMINGLE NB & CD. TEST INFO FOR NB, CD, J SAND SUBMITTED ON DOC# 2288048 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6850 ft. | # Of Holes: | 104 | | Interval Bottom: | 7166 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 5/21/2012 Interval Top: 6850 ft. Interval Bottom: 6980 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/3/2010 | | Treatment Summary: | FRAC'D NIOBRARA W/176459 GALS OF SILVERSTIM AND SLICKWATER WITH 250,000 #'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6850 ft. | # Of Holes: | 48 | | Interval Bottom: | 6980 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/11/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/15/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|