|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 7970 ft. Vertical TD: 7843 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/29/2011 | Proposed Top PZ Location: | Sec:32 Twp: 3N 67W | Footage: 1350 FNL 50 FWL | Bottom Hole Location: | Sec:32 Twp: 3N 67W | Footage: 1350 FNL 50 FWL | Proposed Depth/Form: | 7925 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407087 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 0 ft., Bottom: 600 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7925 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 6865 ft., Bottom: 7929 ft. |
| | |
Wellbore Completed | Completion Date: | 5/8/2010 | Spud Date: | 5/4/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7970 ft. | Measured PB depth: | 7884 ft. | True Vertical TD: | 7843 ft. | True Vertical PB depth: | 7757 ft. | Top PZ Location: | Sec:32 Twp: 3N 67W | Footage: 1347 FNL 61 FWL | Bottom Hole Location: | Sec:32 Twp: 3N 67W | Footage: 1362 FNL 62 FWL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 631 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 235, Top: 0 ft., Bottom: 631 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7954 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 3300 ft., Bottom: 7954 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4196 ft. | | | | NIOBRARA | 7116 ft. | | | | CODELL | 7376 ft. | | | | J SAND | 7822 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7822 ft. Interval Bottom: 7854 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/19/2010 | Treatment Summary: | J SAND COMPLETION. FRAC J-SAND WITH 153,216 GAL 22# TO 18# SILVERSTIM HYBRID CROSS LINKED GEL CONTAINING 250,280 20/40 SAND. 05/19/2010. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7822 ft. | # Of Holes: | 52 | Interval Bottom: | 7854 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/11/2010 Interval Top: 7160 ft. Interval Bottom: 7854 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/19/2010 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7796 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/11/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 25 | BBLS_OIL | 45 | BTU_GAS | 1312 | CALC_BBLS_H2O | 25 | CALC_BBLS_OIL | 45 | CALC_GOR | 4777 | CALC_MCF_GAS | 215 | CASING_PRESS | 469 | GRAVITY_OIL | 52 | MCF_GAS | 215 | TUBING_PRESS | 396 |
| Perforation Data: | Interval Top: | 7160 ft. | # Of Holes: | 172 | Interval Bottom: | 7854 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7160 ft. Interval Bottom: 7396 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/19/2010 | Treatment Summary: | NBRR-CDL COMPLETION. SET CFP @ 7500'. 05-19-10. FRAC THE CODELL WITH 108,318 GAL 22# TO 18# SILVERSTIM HYBRID CROSS LINKED GEL CONTAINING 250,140# SAND. 05/19/2010. SET CFP @ 7290'. 05/19/2010. FRAC NIOBRARA WITH 142,674 GAL 18# SILVERSTIM HYBRID CROSS LINKED GEL CONTAINING 250,320# 20/40 SAND. 05/19/2010. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7160 ft. | # Of Holes: | 120 | Interval Bottom: | 7396 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 12/31/2021 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|