Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30819
Well Classification: GW Status: PA - 11/29/2023
Well Name/No:ARISTOCRAT ANGUS #4-2-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/29/2023
FacilityID:414660LocationID:336635
County:WELD #123Location:SWNE 4 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2161FNL  2083 FELLat/Long: 40.255710 / -104.666350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.255677 / -104.666339Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/29/2023             Measured TD: 7525 ft.    Vertical TD: 7389 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/29/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/24/2011
Proposed Top PZ Location:Sec:4 Twp: 3N 65W Footage: 1342 FNL  2550 FWL
Bottom Hole Location:Sec:4 Twp: 3N 65W Footage: 1344 FNL  2550 FWL
Proposed Depth/Form:7467 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 550 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7252 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 130, Top: 6771 ft., Bottom: 7252 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5236 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4197 ft., Bottom: 5236 ft.

Wellbore Completed
Completion Date:5/2/2010
Spud Date:4/27/2010Spud Date Is:ACTUAL
Measured TD:7525 ft.Measured PB depth:7421 ft.
True Vertical TD:7389 ft.True Vertical PB depth:7285 ft.
Top PZ Location:Sec:4 Twp: 3N 65WFootage: 1342 FNL  2550 FWL
Bottom Hole Location:Sec:4 Twp: 3N 65WFootage: 1344 FNL  2550 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 577 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 0 ft., Bottom: 577 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7514 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 384, Top: 4250 ft., Bottom: 7514 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4476 ft.
NIOBRARA7010 ft.
CODELL7284 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/13/2023                Interval Top: 7284 ft.    Interval Bottom: 7300 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7284 ft.# Of Holes:32
Interval Bottom:7300 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/29/2023                Interval Top: 7010 ft.    Interval Bottom: 7300 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/6/2010
Treatment Summary:NBRR-CDL COMPLETION. FRAC CODELL WITH 146,958 GAL 26# TO 19# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 251,300# SAND. 05-06-10. SET CFP @ 7180'. 05-06-10. FRAC NIOBRARA WITH 145,026 GAL 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 230,400# 20/40 AND 18,220# 40/70 SAND. TOTAL SAND 248,620# WITH 119,910 GALS SLF. 05-06-10. CFP @6900 6/3/10. DRILLED OUR CBP ON 6/4/10. DRILLED OUT CFP @7180 TO COMMINGLE NB & CD. 6/4/10
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 68
BBLS_OIL 66
BTU_GAS 1271
CALC_BBLS_H2O 68
CALC_BBLS_OIL 66
CALC_GOR 12060
CALC_MCF_GAS 796
CASING_PRESS 1580
MCF_GAS 796
Perforation Data:
Interval Top:7010 ft.# Of Holes:168
Interval Bottom:7300 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/13/2023                Interval Top: 7010 ft.    Interval Bottom: 7086 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7010 ft.# Of Holes:136
Interval Bottom:7086 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/29/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No