Wellbore #00 Wellbore Classification: GW Status: AB - 6/8/2023 Measured TD: 8720 ft. Vertical TD: 8597 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/8/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/23/2011 | | Proposed Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 1334 FSL 82 FEL | | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 1340 FSL 62 FEL | | Proposed Depth/Form: | 8651 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1000 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8560 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 7375 ft., Bottom: 8560 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5594 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4578 ft., Bottom: 5594 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/19/2011 | | Spud Date: | 6/15/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8720 ft. | Measured PB depth: | 8681 ft. | | True Vertical TD: | 8597 ft. | True Vertical PB depth: | 8558 ft. | | Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 1334 FSL 82 FEL | | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 1340 FSL 62 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1216 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 458, Top: 0 ft., Bottom: 1216 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8705 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 682, Top: 4050 ft., Bottom: 8705 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4876 ft. | | | | | NIOBRARA | 7687 ft. | | | | | CODELL | 8111 ft. | | | | | J SAND | 8542 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/8/2023 Interval Top: 8550 ft. Interval Bottom: 8575 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/1/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8550'-8575', (50 HOLES) W/71,694 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,000# 20/40 SAND. 08/01/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8550 ft. | # Of Holes: | 50 | | Interval Bottom: | 8575 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 6/8/2023 Interval Top: 8109 ft. Interval Bottom: 8127 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8109 ft. | # Of Holes: | 36 | | Interval Bottom: | 8127 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/8/2023 Interval Top: 7687 ft. Interval Bottom: 8575 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/12/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7620'. 09/07/11. DRILLED OUT CBP @ 7620’, CFP @ 7920’ AND 8180’ TO COMMINGLE THE JSND-CDL-NBRR. 09/11/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8524 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/12/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 81 | | BBLS_OIL | 116 | | BTU_GAS | 1158 | | CALC_BBLS_H2O | 81 | | CALC_BBLS_OIL | 116 | | CALC_GOR | 2767 | | CALC_MCF_GAS | 321 | | CASING_PRESS | 2274 | | GRAVITY_OIL | 49 | | MCF_GAS | 321 | | TUBING_PRESS | 1303 |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 246 | | Interval Bottom: | 8575 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/8/2023 Interval Top: 7687 ft. Interval Bottom: 8127 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/1/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8180’. 08/01/2011. FRAC’D THE CODELL 8109’-8127’, (36 HOLES) W/81,438 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,100# 40/70 SAND. 08/01/11 SET CFP @ 7920’. 08/01/11. FRAC’D THE NIOBRARA 7687’-7872’ (160 HOLES), W/98,015 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,240 # 40/70 SAND. 08/01/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 196 | | Interval Bottom: | 8127 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/8/2023 Interval Top: 7687 ft. Interval Bottom: 7872 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 160 | | Interval Bottom: | 7872 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/08/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|