|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/25/2018 Measured TD: 8105 ft. Vertical TD: 7999 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/25/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/23/2011 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 2590 FNL 1300 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 2590 FNL 1300 FEL | | Proposed Depth/Form: | 8070 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 905 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 905 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8070 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7016 ft., Bottom: 8070 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5346 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 4268 ft., Bottom: 5346 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/3/2010 | | Spud Date: | 6/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8105 ft. | Measured PB depth: | 8040 ft. | | True Vertical TD: | 7999 ft. | True Vertical PB depth: | 7934 ft. | | Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 2537 FNL 1317 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 66W | Footage: 2524 FNL 1354 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 911 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 911 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8100 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 267, Top: 6700 ft., Bottom: 8100 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5534 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 4080 ft., Bottom: 5534 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4080 ft., Depth: 5534 ft., Bottom: 5534 ft., Sacks: 170, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4518 ft. | | | | | NIOBRARA | 7272 ft. | | | | | CODELL | 7516 ft. | | | | | J SAND | 7944 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/20/2018 Interval Top: 7944 ft. Interval Bottom: 7978 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/15/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC THE J-SAND WITH 154,980 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAING 250,940 # 20/40 SAND 7/15/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7944 ft. | # Of Holes: | 48 | | Interval Bottom: | 7978 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/8/2010 Interval Top: 7320 ft. Interval Bottom: 7978 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/8/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE
SET CBP @ 7220, 7/23/10. DRILLED OUT CBP @ 7220, CFP @ 7430 AND CFP @ 7630 TO COMMINGLE THE JSND-NBRR-CDL. 7/24/10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7928 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/8/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 55 | | BBLS_OIL | 59 | | CALC_BBLS_H2O | 55 | | CALC_BBLS_OIL | 59 | | CALC_GOR | 5424 | | CALC_MCF_GAS | 320 | | CASING_PRESS | 1435 | | MCF_GAS | 320 | | TUBING_PRESS | 905 |
| | Perforation Data: | | Interval Top: | 7320 ft. | # Of Holes: | 160 | | Interval Bottom: | 7978 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/20/2018 Interval Top: 7320 ft. Interval Bottom: 7532 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/15/2010 | | Treatment Summary: | NBRR-CDL COMPLETION
SET CFP @ 7630 7/15/10. FRAC THE CODELL WTIH 110,124 GAL 22# VISTAR HYBRID CROSS LINKKED GEL CONTAINING 250,860 # 20/40 SAND. 7/15/10.
SET CFP @ 7430, 7/15/10. FRAC'D THE NIOBRARA WITH 140,748 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,740 # 20/40 SAND, 7/15/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7320 ft. | # Of Holes: | 112 | | Interval Bottom: | 7532 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/20/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|