Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30765
Well Classification: GW Status: SI - 5/1/2022
Well Name/No:CANNON X #04-28D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2022
FacilityID:414500LocationID:336212
County:WELD #123Location:SWSE 33 3N65W 6
Field:WATTENBERG - #90750Elevation:4848 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:592FSL  1992 FELLat/Long: 40.176280 / -104.666270Lat/Long Source: Field Measured
As Drilled Location:660 FSL  1982 FELLat/Long: 40.176470 / -104.666240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2022             Measured TD: 7453 ft.    Vertical TD: 7368 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/18/2011
Proposed Top PZ Location:Sec:33 Twp: 3N 65W Footage: 75 FSL  2565 FEL
Bottom Hole Location:Sec:33 Twp: 3N 65W Footage: 75 FSL  2565 FEL
Proposed Depth/Form:7550 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:12/10/2009
Spud Date:12/6/2009Spud Date Is:ACTUAL
Measured TD:7453 ft.Measured PB depth:7385 ft.
True Vertical TD:7368 ft.True Vertical PB depth:7300 ft.
Top PZ Location:Sec:33 Twp: 3N 65WFootage: 122 FSL  2575 FEL
Bottom Hole Location:Sec:33 Twp: 3N 65WFootage: 122 FSL  2575 FEL
Log Types:CBL/GR/CCL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 732 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 732 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7430 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 1830 ft., Bottom: 7430 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6958 ft.NN
FORT HAYS7240 ft.NN
CODELL7263 ft.NN
GREENHORN7354 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/5/2010                  Interval Top: 7265 ft.    Interval Bottom: 7279 ft.

 Completed Information for Formation CODELL
1st Production Date:1/26/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2010
Treatment Summary:FRACD CODELL WITH 131712 GALS OF VISTAR AND SLICK WATER WITH 268505 #S OF OTTAWA SAND. CODELL IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7265 ft.# Of Holes:56
Interval Bottom:7279 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 5/1/2022                  Interval Top: 7024 ft.    Interval Bottom: 7279 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2010
Treatment Summary:COMMINGLE CODELL/NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/5/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 147
BTU_GAS 1371
CALC_BBLS_H2O 32
CALC_BBLS_OIL 147
CALC_GOR 2748
CALC_MCF_GAS 404
CASING_PRESS 1050
GRAVITY_OIL 53
MCF_GAS 404
Perforation Data:
Interval Top:7024 ft.# Of Holes:104
Interval Bottom:7279 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/5/2010                  Interval Top: 7024 ft.    Interval Bottom: 7132 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/26/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2010
Treatment Summary:FRACD NIOBRARA WITH 186606 GALS OF VISTAR AND SLICK WATER WITH 296610 #S OF OTTAWA SAND. NIOBRARA IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7024 ft.# Of Holes:48
Interval Bottom:7132 ft.Hole Size:0.73 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
04/30/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No