|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/13/2019 Measured TD: 8583 ft. Vertical TD: 8286 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/13/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/2/2011 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 60 FSL 65 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 68 FSL 73 FEL | | Proposed Depth/Form: | 8537 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8537 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 7437 ft., Bottom: 8537 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5413 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4393 ft., Bottom: 5413 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/27/2010 | | Spud Date: | 3/22/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8583 ft. | Measured PB depth: | 8530 ft. | | True Vertical TD: | 8286 ft. | True Vertical PB depth: | 8233 ft. | | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 60 FSL 65 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 68 FSL 73 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 825 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 825 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8569 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 3800 ft., Bottom: 8569 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 5264 ft. | | | | | NIOBRARA | 7654 ft. | | | | | CODELL | 7984 ft. | | | | | J SAND | 8421 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/2/2020 Interval Top: 8430 ft. Interval Bottom: 8450 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | J SAND COMPLETION FRAC THE J-SAND WITH 153,090 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,260# 20/40 SAND. 04-08-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8430 ft. | # Of Holes: | 40 | | Interval Bottom: | 8450 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/25/2010 Interval Top: 7448 ft. Interval Bottom: 8450 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/29/2010 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE SET CBP@7610' 04-26-10. DRILLED OUT CBP @ 7610'. 04-27-10. DRILLED OUT CFP@7850' AND 8100' TO COMMINGLE THE JSND-NBRR-CDL 04-28-10. | | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE SET CBP@7610' 04-2610 DRILLED OUT CBP@7610'. 04-27-10 DRILLED OUT CFP@7850'. AND 8100' TO COMMINGLE THE JSND-NBRR-CDL. 04/28/10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8405 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 45 | | BBLS_OIL | 66 | | BTU_GAS | 1249 | | CALC_BBLS_H2O | 45 | | CALC_BBLS_OIL | 66 | | CALC_GOR | 3833 | | CALC_MCF_GAS | 253 | | CASING_PRESS | 1843 | | GRAVITY_OIL | 49 | | MCF_GAS | 253 | | TUBING_PRESS | 990 |
| | Perforation Data: | | Interval Top: | 7448 ft. | # Of Holes: | 160 | | Interval Bottom: | 8450 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/2/2020 Interval Top: 7448 ft. Interval Bottom: 8004 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | NBRR-CDL COMPLETION SET CFP@8100'.04/08/10 FRAC THE CODELL WITH 107,436 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,880# 20/40 SAND 04-08-10 SET CFP@7850'. 04-08-10 FRAC'D THE NIOBRARA WITH 131,880 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,360# 20/40 SAND. 04-08-10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7448 ft. | # Of Holes: | 120 | | Interval Bottom: | 8004 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/02/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|