|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/7/2021 Measured TD: 7678 ft. Vertical TD: 7544 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/7/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/28/2011 | Proposed Top PZ Location: | Sec:29 Twp: 3N 66W | Footage: 1399 FNL 2611 FEL | Bottom Hole Location: | Sec:29 Twp: 3N 66W | Footage: 1399 FNL 2608 FEL | Proposed Depth/Form: | 7647 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 665, Top: , Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7647 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 7647 ft. | Casing: | String Type: 1ST LINER, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 5/4/2010 | Spud Date: | 5/2/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7678 ft. | Measured PB depth: | 7628 ft. | True Vertical TD: | 7544 ft. | True Vertical PB depth: | 7494 ft. | Top PZ Location: | Sec:29 Twp: 3N 66W | Footage: 1399 FNL 2611 FEL | Bottom Hole Location: | Sec:29 Twp: 3N 66W | Footage: 1399 N 2608 E | Log Types: | PE-CDL, PE-AILC, PE-ML, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 991 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 620, Top: 0 ft., Bottom: 991 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7665 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 930, Top: 580 ft., Bottom: 7665 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4035 ft. | | | | SUSSEX | 4470 ft. | | | | NIOBRARA | 7234 ft. | | | | FORT HAYS | 7491 ft. | | | | CODELL | 7512 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 1/11/2021 Interval Top: 7256 ft. Interval Bottom: 7538 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/7/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/17/2010 | Treatment Summary: | NBRR PERF 7256-7400 HOLES 62 SIZE 0.47. CODL PERF 7522-7538 HOLES 64 SIZE 0.38. FRAC NBRR W/500 GAL 15% HC1 & 247,934 GAL SW & 200,780# 40/70 SAND & 4,240# SB EXCEL. FRAC CODL W/202,037 GAL SW & 151,080# 40/70 SAND & 4,060# SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/16/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1353 | CALC_BBLS_OIL | 66 | CALC_GOR | 3864 | CALC_MCF_GAS | 255 | CASING_PRESS | 3000 | GRAVITY_OIL | 52 |
| Perforation Data: | Interval Top: | 7256 ft. | # Of Holes: | 126 | Interval Bottom: | 7538 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 01/11/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|