|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/21/2020 Measured TD: 6638 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/21/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 20091759 | Expiration Date: | 6/14/2010 | | Proposed Depth/Form: | 7400 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 80, Drill Unit: N2NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: N2NE4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: N/2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 370 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 0 ft., Bottom: 370 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7400 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 6000 ft., Bottom: 7400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/31/2010 | | Spud Date: | 5/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 6638 ft. | Measured PB depth: | 6511 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, GR, CD, CN, DI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 411 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 415 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6574 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 234, Top: 2530 ft., Bottom: 6574 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3320 ft. | | | | | SUSSEX | 3972 ft. | | | | | NIOBRARA | 6234 ft. | | | | | FORT HAYS | 6465 ft. | | | | | CODELL | 6490 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 4/21/2020 Interval Top: 6238 ft. Interval Bottom: 6502 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/2/2010 | | Treatment Summary: | CODL FRAC PUMPED 31,962 GAL PAD FLUID AND 92,238 GAL PHASERFRAC WITH 245,560 LBS 30/50 SAND. ISDP 3136 PSI; ATR 22.3 BPM; ATP 3563 PSI. NBRR FRAC PUMPED 31,962 GAL PAD FLUID AND 114,576 GAL PHASERFRAC WITH 260,640 LBS 30/50 SAND. ISDP 3193 PSI; ATR 51.6 BPM; ATP 4080 PSI. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6238 ft. | # Of Holes: | 100 | | Interval Bottom: | 6502 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/21/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|