Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30570
Well Classification: OW Status: PA - 3/14/2018
Well Name/No:ADAM FARM #7-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/14/2018
FacilityID:412876LocationID:318150
Municipality/County:FIRESTONE / WELD #123Location:SWNE 4 2N68W 6
Field:WATTENBERG - #90750Elevation:4884 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1349FNL  1583 FELLat/Long: 40.171260 / -105.004050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.171265 / -105.004057Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/4/2017             Measured TD: 7620 ft.    Vertical TD: 7532 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/4/2017
Wellbore PermitDIRECTIONAL
Permit #:20092458 Expiration Date:7/27/2011
Proposed Top PZ Location:Sec:4 Twp: 2N 68W Footage: 2081 FNL  2099 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68W Footage: 2081 FNL  2099 FEL
Proposed Depth/Form:7620 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NE

Wellbore Completed
Completion Date:9/30/2009
Spud Date:9/27/2009Spud Date Is:ACTUAL
Measured TD:7620 ft.Measured PB depth:7572 ft.
True Vertical TD:7532 ft.True Vertical PB depth:7484 ft.
Top PZ Location:Sec:4 Twp: 2N 68WFootage: 2081 FNL  2099 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68WFootage: 2081 FNL  2099 FEL
Log Types:CD-CN-ML, DI-GL-GR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 972 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 972 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7608 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 854, Top: 904 ft., Bottom: 7608 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2620 ft.2930 ft.NN
PARKMAN3695 ft.3920 ft.NN
SUSSEX4212 ft.4390 ft.NN
SHANNON4670 ft.4750 ft.NN
NIOBRARA7173 ft.NN
FORT HAYS7421 ft.NN
CODELL7442 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/25/2010                 Interval Top: 7444 ft.    Interval Bottom: 7464 ft.

 Completed Information for Formation CODELL
1st Production Date:2/3/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2009
Treatment Summary:200,450 GALS FLUID & 150,820 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7444 ft.# Of Holes:60
Interval Bottom:7464 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/14/2018                 Interval Top: 7181 ft.    Interval Bottom: 7464 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/3/2010Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/25/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1352
CALC_BBLS_H2O 0
CALC_BBLS_OIL 99
CALC_GOR 1839
CALC_MCF_GAS 182
CASING_PRESS 700
GRAVITY_OIL 50
Perforation Data:
Interval Top:7181 ft.# Of Holes:132
Interval Bottom:7464 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/25/2010                 Interval Top: 7181 ft.    Interval Bottom: 7325 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/3/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2009
Treatment Summary:500 GALS ACID & 241,984 GALS FLUID & 200,240 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7181 ft.# Of Holes:72
Interval Bottom:7325 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/14/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No