|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/16/2015 Measured TD: 6784 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/16/2015 | | Wellbore Permit | DRIFTED | | Permit #: | 20091786 | Expiration Date: | 6/9/2010 | | Proposed Depth/Form: | 6900 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NW4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6900 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 615, Top: , Bottom: 6900 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/24/2010 | | Spud Date: | 5/21/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 6784 ft. | Measured PB depth: | 6717 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GR/CCL/VDL, DIL/GR/GL, Density/Neutron/Microlog | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 573 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 243, Top: 16 ft., Bottom: 573 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6762 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 2368 ft., Bottom: 6762 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2737 ft. | | | | | PARKMAN | 3497 ft. | | | | | SUSSEX | 4234 ft. | | | | | NIOBRARA | 6330 ft. | | | | | FORT HAYS | 6593 ft. | | | | | CODELL | 6617 ft. | 6789 ft. | | | | GREENHORN | 6690 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 12/16/2015 Interval Top: 6619 ft. Interval Bottom: 6626 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/9/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/7/2010 | | Treatment Summary: | The Codell is producing through composite flow through plugs
Frac'd Codell w/ 99666 gals Silverstim, Acid, and Slick Water with 195103 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6619 ft. | # Of Holes: | 28 | | Interval Bottom: | 6626 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/16/2015 Interval Top: 6358 ft. Interval Bottom: 6626 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/7/2010 | | Treatment Summary: | Codell & Niobrara are commingled |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/23/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 93 | | BTU_GAS | 1256 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 93 | | CALC_GOR | 1011 | | CALC_MCF_GAS | 94 | | CASING_PRESS | 500 | | GRAVITY_OIL | 43 | | MCF_GAS | 94 |
| | Perforation Data: | | Interval Top: | 6358 ft. | # Of Holes: | 64 | | Interval Bottom: | 6626 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 12/16/2015 Interval Top: 6358 ft. Interval Bottom: 6522 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/7/2010 | | Treatment Summary: | The Niobrara is producing through composite flow through plugs
Frac'd Niobrara w/273714 gals Silverstim, Acid, and Slick Water with 399541 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6358 ft. | # Of Holes: | 36 | | Interval Bottom: | 6522 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/16/2015 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|