|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/17/2022 Measured TD: 8560 ft. Vertical TD: 8407 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/17/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/26/2012 | Proposed Top PZ Location: | Sec:12 Twp: 1N 68W | Footage: 1990 681 | Bottom Hole Location: | Sec:12 Twp: 1N 68W | Footage: 1983 670 | Proposed Depth/Form: | 8569 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8569 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8569 ft. |
| | |
Wellbore Completed | Completion Date: | 9/10/2010 | Spud Date: | 9/7/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8560 ft. | Measured PB depth: | 8515 ft. | True Vertical TD: | 8407 ft. | True Vertical PB depth: | 8362 ft. | Top PZ Location: | Sec:12 Twp: 1N 68W | Footage: 1990 FNL 681 FEL | Bottom Hole Location: | Sec:12 Twp: 1N 68W | Footage: 1983 FNL 670 FEL | Log Types: | Preliminary Form 5 | Log Types: | CD-CN-ML, DI-GL-GR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 1145, Top: 0 ft., Bottom: 1018 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8489 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 2165 ft., Bottom: 8489 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4774 ft. | | | | SUSSEX | 5004 ft. | | | | SHANNON | 5400 ft. | | | | NIOBRARA | 7624 ft. | | | | FORT HAYS | 7938 ft. | | | | CODELL | 7960 ft. | | | | J SAND | 8400 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 3/17/2022 Interval Top: 8412 ft. Interval Bottom: 8426 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/29/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/1/2010 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 145,803 gal Slickwater w/ 116,320# 40/70, 4,000# SB Excel. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8395 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/3/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | BTU_GAS | 1109 | CALC_BBLS_OIL | 1 | CALC_GOR | 2000 | CALC_MCF_GAS | 2 | CASING_PRESS | 2046 | GRAVITY_OIL | 66 | MCF_GAS | 2 | TUBING_PRESS | 1039 |
| Perforation Data: | Interval Top: | 8412 ft. | # Of Holes: | 56 | Interval Bottom: | 8426 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/17/2022 Interval Top: 7734 ft. Interval Bottom: 7980 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/29/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/15/2010 | Treatment Summary: | NB PERF 7734-7840 HOLES 60 SIZE 0.42 CD PERF 7962-7980 HOLES 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 238,306 gal Slickwater w/ 200,660# 40/70, 4,000# SuperLC.
Frac Codell down 4-1/2" Csg w/ 206,174 gal Slickwater w/ 150,280# 40/70, 4,000# SuperLC. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8395 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/3/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 119 | BTU_GAS | 1109 | CALC_BBLS_OIL | 119 | CALC_GOR | 1513 | CALC_MCF_GAS | 180 | CASING_PRESS | 2046 | GRAVITY_OIL | 66 | MCF_GAS | 180 | TUBING_PRESS | 1039 |
| Perforation Data: | Interval Top: | 7734 ft. | # Of Holes: | 114 | Interval Bottom: | 7980 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/17/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|