|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/19/2018 Measured TD: 8050 ft. Vertical TD: 7749 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/19/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | 20091621 | Expiration Date: | 5/12/2010 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2600 FNL 75 FEL | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 2600 FNL 75 FEL | Proposed Depth/Form: | 8043 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 7/11/2009 | Spud Date: | 7/7/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8050 ft. | Measured PB depth: | 8023 ft. | True Vertical TD: | 7749 ft. | True Vertical PB depth: | 7722 ft. | Top PZ Location: | Sec:14 Twp: 2N 65W | Footage: 2616 FNL 93 FEL | Bottom Hole Location: | Sec:14 Twp: 2N 65W | Footage: 2616 FNL 93 FEL | Log Types: | CBL-NO OPEN HOLE LOGS | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 843 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 843 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8020 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 215, Top: 6640 ft., Bottom: 8020 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4785 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 535, Top: 1163 ft., Bottom: 5670 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4785 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 535, Top: 1065 ft., Bottom: 5670 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4289 ft. | | N | N | SUSSEX | 4544 ft. | | N | N | NIOBRARA | 7116 ft. | | N | N | FORT HAYS | 7408 ft. | | N | N | CODELL | 7424 ft. | | N | N | J SAND | 7878 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/26/2009 Interval Top: 7426 ft. Interval Bottom: 7442 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/12/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/8/2009 | Treatment Summary: | 158,926 GALS FLUID & 115,160 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7426 ft. | # Of Holes: | 64 | Interval Bottom: | 7442 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/19/2018 Interval Top: 7188 ft. Interval Bottom: 7442 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/12/2009 | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/11/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/26/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1246 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 28 | CALC_GOR | 1536 | CALC_MCF_GAS | 43 | CASING_PRESS | 400 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7188 ft. | # Of Holes: | 118 | Interval Bottom: | 7442 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/26/2009 Interval Top: 7188 ft. Interval Bottom: 7282 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/12/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/9/2009 | Treatment Summary: | 500 GALS ACID & 243,044 GALS FLUID & 2021,040 LBS 40/70 SAND & 4,000 LBS 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7188 ft. | # Of Holes: | 54 | Interval Bottom: | 7282 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 11/19/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|