|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2025 Measured TD: 8240 ft. Vertical TD: 8137 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20091501 | Expiration Date: | 5/5/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2500 FNL 1400 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 66W | Footage: 2500 FNL 1400 FEL | | Proposed Depth/Form: | 8189 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1030 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1030 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8189 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 7080 ft., Bottom: 8189 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5485 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4423 ft., Bottom: 5485 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/27/2010 | | Spud Date: | 3/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8240 ft. | Measured PB depth: | 8180 ft. | | True Vertical TD: | 8137 ft. | True Vertical PB depth: | 8077 ft. | | Top PZ Location: | Sec:34 Twp: 2N 66W | Footage: 2483 FNL 1392 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 66W | Footage: 2520 FNL 1390 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1039 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 1039 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8228 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 529, Top: 4100 ft., Bottom: 8228 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7298 ft. | | | | | CODELL | 7610 ft. | | | | | J SAND | 8066 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 12/1/2024 Interval Top: 8072 ft. Interval Bottom: 8086 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE JSND WITH 153,970 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,540# 20/40 SAND. 04/08/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8072 ft. | # Of Holes: | 28 | | Interval Bottom: | 8086 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/2/2010 Interval Top: 7387 ft. Interval Bottom: 8086 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7480' 04/26/10. DRILLED OUT CFP @ 7710' TO COMMINGLE THE JSND-NBRR-CDL. 04/27/10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8051 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/2/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 18 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 1056 | | CALC_MCF_GAS | 19 | | CASING_PRESS | 1470 | | MCF_GAS | 19 | | TUBING_PRESS | 106 |
| | Perforation Data: | | Interval Top: | 7387 ft. | # Of Holes: | 144 | | Interval Bottom: | 8086 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2024 Interval Top: 7387 ft. Interval Bottom: 7628 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | NBRR-CDL COMPLETION. SET CFP @ 7710'. 04/08/10. FRAC'D THE CODELL WITH 109,410 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,340# SAND. 04/08/10. SET CFP @ 7480'. 04/08/10. FRAC'D THE NIOBRARA WITH 132,510 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,040# SAND. 04/08/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7387 ft. | # Of Holes: | 116 | | Interval Bottom: | 7628 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 11/30/2024 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|