|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/3/2021 Measured TD: 8270 ft. Vertical TD: 8146 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/3/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/7/2013 | Prop Depth/Form: | 8270 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 335, Top: 0 ft., Bottom: 880 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 223, Top: 6390 ft., Bottom: 8264 ft. | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5350 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 540, Top: 1370 ft., Bottom: 5484 ft. |
| | |
Wellbore Completed | Completion Date: | 8/18/2009 | Spud Date: | 8/14/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8270 ft. | Measured PB depth: | 8245 ft. | True Vertical TD: | 8146 ft. | True Vertical PB depth: | 8121 ft. | Top PZ Location: | Sec:30 Twp: 2N 68W | Footage: 2132 FNL 487 FWL | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 2132 FNL 487 FWL | Log Types: | CD-CN-ML, DI-GL-GR,CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 335, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 223, Top: 6650 ft., Bottom: 8264 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5351 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5351 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 540, Top: 1360 ft., Bottom: 5450 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3864 ft. | | N | N | SUSSEX | 4460 ft. | | N | N | SHANNON | 4898 ft. | | N | N | NIOBRARA | 7390 ft. | | N | N | FORT HAYS | 7668 ft. | | N | N | CODELL | 7687 ft. | | N | N | J SAND | 8100 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 12/9/2021 Interval Top: 8126 ft. Interval Bottom: 8148 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/19/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/2/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 161,398 gal Slickwater w/ 159,260# 40/70, 4,000# SuperLC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8126 ft. | # Of Holes: | 66 | Interval Bottom: | 8148 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 7688 ft. Interval Bottom: 7708 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/27/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/16/2009 | Treatment Summary: | 209,687 GALS FLUID & 150,080 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7688 ft. | # Of Holes: | 60 | Interval Bottom: | 7708 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/8/2011 Interval Top: 7391 ft. Interval Bottom: 8148 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/19/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/2/2011 | Treatment Summary: | JSND REC |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8104 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/8/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 11 | BTU_GAS | 1298 | CALC_BBLS_OIL | 11 | CALC_GOR | 6364 | CALC_MCF_GAS | 70 | CASING_PRESS | 920 | GRAVITY_OIL | 51 | MCF_GAS | 70 | TUBING_PRESS | 755 |
| Perforation Data: | Interval Top: | 7391 ft. | # Of Holes: | 198 | Interval Bottom: | 8148 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/9/2021 Interval Top: 7391 ft. Interval Bottom: 7708 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/27/2009 | Choke Size: | 0.219 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/16/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/9/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1174 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 59 | CALC_GOR | 2712 | CALC_MCF_GAS | 160 | CASING_PRESS | 1250 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7391 ft. | # Of Holes: | 132 | Interval Bottom: | 7708 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 7391 ft. Interval Bottom: 7574 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/27/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/17/2009 | Treatment Summary: | 245,699 GALS FLUID & 200,060 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7391 ft. | # Of Holes: | 72 | Interval Bottom: | 7574 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 12/03/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|