|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/21/2017 Measured TD: 8560 ft. Vertical TD: 8505 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/21/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084670 | Expiration Date: | 4/13/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2140 FSL 510 FWL | | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 2140 FSL 510 FWL | | Proposed Depth/Form: | 8489 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5473 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 4391 ft., Bottom: 5473 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/18/2009 | | Spud Date: | 6/12/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8560 ft. | Measured PB depth: | 8474 ft. | | True Vertical TD: | 8505 ft. | True Vertical PB depth: | 8419 ft. | | Top PZ Location: | Sec:19 Twp: 1N 68W | Footage: 2120 FSL 524 FWL | | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 2120 FSL 524 FWL | | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 886 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 886 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8546 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 4352 ft., Bottom: 8546 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4592 ft. | | N | N | | NIOBRARA | 7456 ft. | | N | N | | CODELL | 7890 ft. | | N | N | | J SAND | 8324 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/21/2017 Interval Top: 8336 ft. Interval Bottom: 8348 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/19/2009 | | Treatment Summary: | JSND COMPLETION. FRAC'D JSND W/ 153,522 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,880# SAND. 7/19/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8336 ft. | # Of Holes: | 24 | | Interval Bottom: | 8348 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/1/2009 Interval Top: 7640 ft. Interval Bottom: 8348 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/18/2009 | | Treatment Summary: | SET CBP @ 7550'. DRILLED UP CBP @ 7550', CFP @ 7770' AND 8010' TO COMMINGLE JSND-NBRR-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8329 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/1/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 55 | | BBLS_OIL | 47 | | BTU_GAS | 1082 | | CALC_BBLS_H2O | 55 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 7660 | | CALC_MCF_GAS | 360 | | CASING_PRESS | 801 | | GRAVITY_OIL | 49 | | MCF_GAS | 360 | | TUBING_PRESS | 364 |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 136 | | Interval Bottom: | 8348 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/21/2017 Interval Top: 7640 ft. Interval Bottom: 7906 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/19/2009 | | Treatment Summary: | NB-CD COMPLETION. SET CFP@ 8010. FRAC'D CODL W/ 109,788 GAL 24# - 18# VISTAR HYBRID CROSS LINKED GEL W/ 250,440# 20/40 SND. SET CFP@ 7770'. FRAC'D NBRR W/ 132,258 GAL 18# VISTAR X-LINKED GEL HYBRID W/250,040# 20/40 SAND. 7/19/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/26/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 82 | | BBLS_OIL | 100 | | BTU_GAS | 1167 | | CALC_BBLS_H2O | 82 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 3910 | | CALC_MCF_GAS | 391 | | CASING_PRESS | 793 | | GRAVITY_OIL | 50 | | MCF_GAS | 391 |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 112 | | Interval Bottom: | 7906 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/21/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|