|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2023 Measured TD: 7835 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2023 | Wellbore Permit | | Permit #: | | Expiration Date: | 12/26/2013 | Prop Depth/Form: | 7835 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: Unspaced , Unit Acreage: 40, Drill Unit: SWSW | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 40, Drill Unit: SWSW | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: SWSW | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: SWSW | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: Unspaced , Unit Acreage: 40, Drill Unit: SWSW | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 570, Top: 0 ft., Bottom: 1114 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7828 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1019, Top: 468 ft., Bottom: 7835 ft. |
| | |
Wellbore Completed | Completion Date: | 5/21/2009 | Spud Date: | 5/16/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7835 ft. | Measured PB depth: | 7813 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP.DENSITY/NEUTRON MICRO, DUAL IND./GR, GR CCL/CBL VDL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1114 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 1114 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7828 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1019, Top: 468 ft., Bottom: 7835 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6790 ft. | 7010 ft. | N | N | CODELL | 7050 ft. | 7070 ft. | N | N | D SAND | 7538 ft. | 7546 ft. | N | N | J SAND | 7630 ft. | 7736 ft. | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/11/2012 Interval Top: 7642 ft. Interval Bottom: 7704 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/12/2009 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/5/2009 | Treatment Summary: | FRAC'D J-SAND W/ 4000# 100MESH, 340000# 20/40 AND 20000# 20/40 SB EXCEL SAND USING 113630 GAL 26# SILVERSTIM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 128 | BBLS_OIL | 27 | BTU_GAS | 1242 | CALC_GOR | 74 | CASING_PRESS | 140 | GRAVITY_OIL | 43 | MCF_GAS | 2 | TUBING_PRESS | 140 |
| Perforation Data: | Interval Top: | 7642 ft. | # Of Holes: | 248 | Interval Bottom: | 7704 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/6/2012 Interval Top: 7053 ft. Interval Bottom: 7069 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/17/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/27/2012 | Treatment Summary: | Frac'd Codell w/ 125148 gals of Slick Water, vistar, and 15% HCI with 239226#'s of Ottawa sand. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7053 ft. | # Of Holes: | 64 | Interval Bottom: | 7069 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2021 Interval Top: 6838 ft. Interval Bottom: 7069 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/17/2012 | Choke Size: | 12.000 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/21/2009 | Treatment Summary: | |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6813 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/18/2012 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 69 | BTU_GAS | 1321 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 69 | CALC_GOR | 652 | CALC_MCF_GAS | 45 | CASING_PRESS | 65 | GRAVITY_OIL | 54 | MCF_GAS | 45 | TUBING_PRESS | 205 |
| Perforation Data: | Interval Top: | 6838 ft. | # Of Holes: | 192 | Interval Bottom: | 7069 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/6/2012 Interval Top: 6838 ft. Interval Bottom: 6896 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/17/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/27/2012 | Treatment Summary: | Frac'd Niobrara w/ 184800 gals of Slick Water and Vistar with 254913#'s of Ottawa sand. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6838 ft. | # Of Holes: | 48 | Interval Bottom: | 6896 ft. | Hole Size: | 0.72 in. |
|
Formation DKTA Formation Classification: GW Status: SI - 5/1/2023 Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/21/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 09/30/2021 |
Low Producing | Y | Production Period 10/2023 - 09/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|