Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30073
Well Classification: OW Status: PA - 10/28/2024
Well Name/No:MEAD PLACE #11-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/28/2024
FacilityID:301612LocationID:336325
Municipality/County:MEAD / WELD #123Location:NESW 22 3N68W 6
Field:WATTENBERG - #90750Elevation:4979 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1613FSL  1646 FWLLat/Long: 40.208570 / -104.992500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.208569 / -104.992500Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/28/2024             Measured TD: 7550 ft.    Vertical TD: 7477 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/28/2024
Wellbore PermitDIRECTIONAL
Permit #:20090355 Expiration Date:2/17/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2150 FSL  2150 FWL
Bottom Hole Location:Sec:22 Twp: 3N 68W Footage: 2150 FSL  2150 FWL
Proposed Depth/Form:7543 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SW4

Wellbore Completed
Completion Date:9/6/2009
Spud Date:9/3/2009Spud Date Is:ACTUAL
Measured TD:7550 ft.Measured PB depth:7501 ft.
True Vertical TD:7477 ft.True Vertical PB depth:7428 ft.
Top PZ Location:Sec:22 Twp: 3N 68WFootage: 2140 FSL  2095 FWL
Bottom Hole Location:Sec:22 Twp: 3N 68WFootage: 2140 FSL  2095 FWL
Log Types:P/E AILC-CNLD-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 543 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 543 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7537 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 1134 ft., Bottom: 7537 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3674 ft.3755 ft.NN
SUSSEX4094 ft.4370 ft.NN
SHANNON4650 ft.4700 ft.NN
NIOBRARA7103 ft.NN
FORT HAYS7355 ft.NN
CODELL7374 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/30/2009                Interval Top: 7379 ft.    Interval Bottom: 7395 ft.

 Completed Information for Formation CODELL
1st Production Date:11/24/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2009
Treatment Summary:209,268 GALS FLUID & 150,280 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7379 ft.# Of Holes:64
Interval Bottom:7395 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/28/2024                Interval Top: 7129 ft.    Interval Bottom: 7395 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/24/2009Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1208
CALC_BBLS_H2O 0
CALC_BBLS_OIL 17
CALC_MCF_GAS 0
CASING_PRESS 1400
GRAVITY_OIL 50
Perforation Data:
Interval Top:7129 ft.# Of Holes:128
Interval Bottom:7395 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/30/2009                Interval Top: 7129 ft.    Interval Bottom: 7254 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/24/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/2009
Treatment Summary:500 GALS ACID & 250,527 GALS FLUID & 200,300 LBS 40/70 SAND 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7129 ft.# Of Holes:64
Interval Bottom:7254 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/28/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No