|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/28/2024 Measured TD: 8215 ft. Vertical TD: 7871 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/28/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090358 | Expiration Date: | 2/16/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 660 FSL 1980 FEL | | Bottom Hole Location: | Sec:22 Twp: 3N 68W | Footage: 660 FSL 1980 FEL | | Proposed Depth/Form: | 8261 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 9/3/2009 | | Spud Date: | 8/30/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8215 ft. | Measured PB depth: | 8164 ft. | | True Vertical TD: | 7871 ft. | True Vertical PB depth: | 7820 ft. | | Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 664 FSL 1983 FEL | | Bottom Hole Location: | Sec:22 Twp: 3N 68W | Footage: 664 FSL 1983 FEL | | Log Types: | P/E AILC-CNLD-ML-TC, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 532 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 532 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 532 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 532 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8202 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 785, Top: 870 ft., Bottom: 8202 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2700 ft. | 2890 ft. | N | N | | PARKMAN | 3796 ft. | 4014 ft. | N | N | | SUSSEX | 4296 ft. | 4506 ft. | N | N | | SHANNON | 4852 ft. | 5010 ft. | N | N | | NIOBRARA | 7382 ft. | | N | N | | FORT HAYS | 7628 ft. | | N | N | | CODELL | 7649 ft. | | N | N | | J SAND | 8085 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/11/2010 Interval Top: 7653 ft. Interval Bottom: 7669 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/23/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/6/2009 | | Treatment Summary: | 204191 GALS FLUID & 150540 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7653 ft. | # Of Holes: | 64 | | Interval Bottom: | 7669 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/28/2024 Interval Top: 7406 ft. Interval Bottom: 7669 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/23/2009 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/23/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/11/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1306 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 1400 | | CALC_MCF_GAS | 7 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7406 ft. | # Of Holes: | 136 | | Interval Bottom: | 7669 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/11/2010 Interval Top: 7406 ft. Interval Bottom: 7524 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2009 | | Treatment Summary: | 254135 GALS FLUID & 200620 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7406 ft. | # Of Holes: | 72 | | Interval Bottom: | 7524 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/28/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|