|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/3/2019 Measured TD: 8707 ft. Vertical TD: 8570 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/3/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/24/2011 | Proposed Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 587 FSL 2091 FEL | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 591 FSL 2095 FEL | Proposed Depth/Form: | 8671 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1080 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1080 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8671 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 7501 ft., Bottom: 8671 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5668 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 4536 ft., Bottom: 5668 ft. |
| | |
Wellbore Completed | Completion Date: | 7/1/2011 | Spud Date: | 6/27/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8707 ft. | Measured PB depth: | 8658 ft. | True Vertical TD: | 8570 ft. | True Vertical PB depth: | 8521 ft. | Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 587 FSL 2091 FEL | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 591 S 2095 E | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1215 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 475, Top: 0 ft., Bottom: 1215 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8693 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 4530 ft., Bottom: 8693 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4895 ft. | | | | NIOBRARA | 7725 ft. | | | | CODELL | 8124 ft. | | | | J SAND | 8563 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 2/25/2021 Interval Top: 8522 ft. Interval Bottom: 8542 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/1/2011 | Treatment Summary: | J SAND COMPLETION. FRAC’D THE J-SAND 8522’-8542’, (40 HOLES) W/53,231 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 200,000# 20/40 SAND. 08/01/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8522 ft. | # Of Holes: | 40 | Interval Bottom: | 8542 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/10/2011 Interval Top: 7725 ft. Interval Bottom: 8542 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/10/2011 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7600’. 10/05/11 DRILLED OUT CBP @ 7600’, CFP @ 8200’ AND 7980’ TO COMMINGLE THE JSND-CDL-NBRR. 10/06/2011. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8557 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/10/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 77 | BBLS_OIL | 86 | BTU_GAS | 1158 | CALC_BBLS_H2O | 77 | CALC_BBLS_OIL | 86 | CALC_GOR | 4659 | CALC_MCF_GAS | 407 | CASING_PRESS | 1253 | GRAVITY_OIL | 50 | MCF_GAS | 407 | TUBING_PRESS | 484 |
| Perforation Data: | Interval Top: | 7725 ft. | # Of Holes: | 268 | Interval Bottom: | 8542 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/25/2021 Interval Top: 7725 ft. Interval Bottom: 8144 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/1/2011 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8200’. 08/01/2011. FRAC’D THE CODELL 8124’-8144’, (40 HOLES) W/8,922 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 253,049# 40/70 SAND. 08/01/11 SET CFP @ 7980’. 08/01/2011. FRAC’D THE NIOBRARA 7725’-7925’ (188 HOLES), W/90720 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,100# 40/70 SAND. 08/01/2011 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7725 ft. | # Of Holes: | 228 | Interval Bottom: | 8144 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/25/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|