|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/10/2022 Measured TD: 7096 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/10/2022 | Wellbore Permit | | Permit #: | | Expiration Date: | 5/11/2012 | Proposed Depth/Form: | 7100 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E/2, SW/4 |
| | |
Wellbore Completed | Completion Date: | 9/14/2010 | Spud Date: | 9/11/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7096 ft. | Measured PB depth: | 7072 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP. DENSITY NEUTRON GR; DUAL INDUCTION LOG GR; CEMENT BOND-VD | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 440, Top: 0 ft., Bottom: 568 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7085 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 505, Top: 2529 ft., Bottom: 7085 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 751 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 170, Top: 80 ft., Bottom: 751 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GREELEY SAND | 2890 ft. | | | | PARKMAN | 3695 ft. | | | | SUSSEX | 4050 ft. | | | | SHANNON | 4436 ft. | | | | NIOBRARA | 6609 ft. | | | | FORT HAYS | 6872 ft. | | | | CODELL | 6895 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/7/2010 Interval Top: 6898 ft. Interval Bottom: 6908 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/30/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/28/2010 | Treatment Summary: | FRAC CODELL WITH 4128 BBLS SLICKWATER AND 115,000# 30/50 SAND
SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC
TREAT AT AN AVERAGE OF 4775 PSI 62.5 BPM MAX PRESSURE 5609 PSI MAX RATE 63.1 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/7/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 8 | BBLS_OIL | 38 | BTU_GAS | 1242 | CALC_GOR | 1000 | CASING_PRESS | 500 | GRAVITY_OIL | 50 | MCF_GAS | 38 |
| Perforation Data: | Interval Top: | 6898 ft. | # Of Holes: | 40 | Interval Bottom: | 6908 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/10/2022 Interval Top: 6614 ft. Interval Bottom: 6908 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/9/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6886 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/20/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 28 | BTU_GAS | 1242 | CALC_GOR | 1143 | CASING_PRESS | 1100 | GRAVITY_OIL | 46 | MCF_GAS | 32 | TUBING_PRESS | 900 |
| Perforation Data: | Interval Top: | 6614 ft. | # Of Holes: | 224 | Interval Bottom: | 6908 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/15/2010 Interval Top: 6614 ft. Interval Bottom: 6746 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/4/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/3/2010 | Treatment Summary: | FRAC NIOBRARA WITH 4376 BBLS DYNAFLOW 2 WR FLUID; 238000# 30/50 SAND; AND 12000 # 20/40 RESIN COATED SAND
SPEARHEAD 24 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE-PAD.
TREAT AT AN AVERAGE OF 4194 PSI 59.8 BPM MAX PRESSURE 5650 PSI MAX RATE 60.5 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/15/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 12 | BTU_GAS | 1242 | CALC_GOR | 917 | CASING_PRESS | 225 | GRAVITY_OIL | 43 | MCF_GAS | 11 |
| Perforation Data: | Interval Top: | 6614 ft. | # Of Holes: | 184 | Interval Bottom: | 6746 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 02/10/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|