|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2021 Measured TD: 8145 ft. Vertical TD: 8046 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20087433 | Expiration Date: | 12/29/2009 | | Proposed Top PZ Location: | Sec:1 Twp: 2N 66W | Footage: 1312 FNL 36 FEL | | Bottom Hole Location: | Sec:1 Twp: 2N 66W | Footage: 1312 FNL 36 FEL | | Proposed Depth/Form: | 8099 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 11/10/2009 | | Spud Date: | 11/6/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8145 ft. | Measured PB depth: | 8094 ft. | | True Vertical TD: | 8046 ft. | True Vertical PB depth: | 7995 ft. | | Top PZ Location: | Sec:1 Twp: 2N 66W | Footage: 1312 FNL 36 FEL | | Bottom Hole Location: | Sec:1 Twp: 2N 66W | Footage: 1312 FNL 36 FEL | | Log Types: | DI-GL-GR, CD-CN, ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 982 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 982 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 6750 ft., Bottom: 8129 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5022 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 1146 ft., Bottom: 5022 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4159 ft. | 4212 ft. | N | N | | SUSSEX | 4519 ft. | 4841 ft. | N | N | | NIOBRARA | 7330 ft. | | N | N | | FORT HAYS | 7495 ft. | | N | N | | CODELL | 7520 ft. | | N | N | | J & SUSSEX | 7958 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/5/2010 Interval Top: 7521 ft. Interval Bottom: 7538 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/20/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/11/2010 | | Treatment Summary: | 201,894 GALS FLUID & 150,660 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7521 ft. | # Of Holes: | 68 | | Interval Bottom: | 7538 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2021 Interval Top: 7390 ft. Interval Bottom: 7538 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/20/2010 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/14/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/5/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1275 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 3087 | | CALC_MCF_GAS | 179 | | CASING_PRESS | 225 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7390 ft. | # Of Holes: | 122 | | Interval Bottom: | 7538 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/5/2010 Interval Top: 7390 ft. Interval Bottom: 7408 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/20/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/14/2009 | | Treatment Summary: | 500 GALS ACID & 249,900 GALS FLUID & 200,560 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7390 ft. | # Of Holes: | 54 | | Interval Bottom: | 7408 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2021 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|