|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2022 Measured TD: 8045 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2022 | | Wellbore Permit | | | Permit #: | 20087213 | Expiration Date: | 12/21/2009 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW |
| | |
| Wellbore Completed | | Completion Date: | 2/12/2009 | | Spud Date: | 2/8/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8045 ft. | Measured PB depth: | 5600 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL/CBL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 983 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 419, Top: 0 ft., Bottom: 983 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 6550 ft., Bottom: 8037 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5595 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 1013 ft., Bottom: 5675 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4142 ft. | | N | N | | SUSSEX | 4671 ft. | | N | N | | SHANNON | 5120 ft. | | N | N | | NIOBRARA | 7107 ft. | | N | N | | FORT HAYS | 7385 ft. | | N | N | | CODELL | 7408 ft. | | N | N | | GREENHORN | 7477 ft. | | N | N | | D SAND | 7795 ft. | | N | N | | MOWRY | 7846 ft. | | N | N | | J SAND | 7869 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 5/1/2022 Interval Top: 7870 ft. Interval Bottom: 7900 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/6/2009 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2009 | | Treatment Summary: | FRAC'D JSND W/ 179,004 GALS SLICKWATER & SILVERSTIM W/ 335,000# OTTAWA SAND. PRODUCING THROUGH FLOW PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7870 ft. | # Of Holes: | 48 | | Interval Bottom: | 7900 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/22/2008 Interval Top: 7409 ft. Interval Bottom: 7445 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/6/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2009 | | Treatment Summary: | FRAC'D CODL W/ 133,308 GALS SLICKWATER & SILVERSTIM W/ 270,000# OTTAWA SAND. PRODUCING THROUGH FLOW PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7409 ft. | # Of Holes: | 40 | | Interval Bottom: | 7445 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/17/2009 Interval Top: 7191 ft. Interval Bottom: 7900 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/12/2009 | | Treatment Summary: | COMMINGLE JSND, NBRR, & CODL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 86 | | BTU_GAS | 1356 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 86 | | CALC_GOR | 4256 | | CALC_MCF_GAS | 366 | | CASING_PRESS | 600 | | GRAVITY_OIL | 49 | | MCF_GAS | 366 |
| | Perforation Data: | | Interval Top: | 7191 ft. | # Of Holes: | 112 | | Interval Bottom: | 7900 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 10/22/2008 Interval Top: 7191 ft. Interval Bottom: 7203 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/6/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2009 | | Treatment Summary: | FRAC'D NBRR W/ 173,460 GALS SLICKWATER & SILVERSTIM W/250,000# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7191 ft. | # Of Holes: | 24 | | Interval Bottom: | 7203 ft. | Hole Size: | 0.72 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 5/1/2022| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/6/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 04/30/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|