Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29661
Well Classification: GW Status: PR - 2/1/2024
Well Name/No:JOHNSON #4-4-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2024
FacilityID:300226LocationID:336430
Municipality/County:FIRESTONE / WELD #123Location:SENW 12 2N68W 6
Field:WATTENBERG - #90750Elevation:4862 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1683FNL  1683 FWLLat/Long: 40.155960 / -104.955050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.155971 / -104.955054Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2024             Measured TD: 8103 ft.    Vertical TD: 7946 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20086959 Expiration Date:12/14/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2630 FNL  2670 FWL
Bottom Hole Location:Sec:12 Twp: 2N 68W Footage: 2630 FNL  2670 FWL
Proposed Depth/Form:8138 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5098 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4107 ft., Bottom: 5098 ft.

Wellbore Completed
Completion Date:3/22/2009
Spud Date:3/16/2009Spud Date Is:ACTUAL
Measured TD:8103 ft.Measured PB depth:8080 ft.
True Vertical TD:7946 ft.True Vertical PB depth:7923 ft.
Top PZ Location:Sec:12 Twp: 2N 68WFootage: 2637 FNL  2650 FWL
Bottom Hole Location:Sec:12 Twp: 2N 68WFootage: 2637 FNL  2650 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 751 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 751 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8091 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 3378 ft., Bottom: 8091 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON4866 ft.NN
NIOBRARA7324 ft.NN
CODELL7550 ft.NN
J SAND7980 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 2/1/2024                  Interval Top: 7984 ft.    Interval Bottom: 8018 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/25/2009
Treatment Summary:J SAND COMPLETION. FRAC'D THE J SAND WITH 156,742 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 265,560# SAND 03/25/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7984 ft.# Of Holes:60
Interval Bottom:8018 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  GW                     Status:  PR - 2/1/2024                  Interval Top: 7550 ft.    Interval Bottom: 7570 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/25/2009
Treatment Summary:CDL RECOMPLETION. SET CFP @ 7660'. 03/25/09. FRAC'D THE CODELL WITH 109,620 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 244,340# 20/40 SAND 03/25/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 21
BTU_GAS 1270
CALC_BBLS_H2O 28
CALC_BBLS_OIL 21
CALC_GOR 25904
CALC_MCF_GAS 544
CASING_PRESS 920
GRAVITY_OIL 49
MCF_GAS 544
Perforation Data:
Interval Top:7550 ft.# Of Holes:40
Interval Bottom:7570 ft.Hole Size:0.41 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/26/2009                 Interval Top: 7550 ft.    Interval Bottom: 8018 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/22/2009
Treatment Summary:JSND-CDL COMMINGLE. DRILLED OUT CFP @7660' TO COMMINGLE THE JSND-CDL. 04-09-09.
Tubing Size:2.375 in.Tubing Setting Depth:7952 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 75
BBLS_OIL 38
BTU_GAS 1270
CALC_BBLS_H2O 75
CALC_BBLS_OIL 38
CALC_GOR 17447
CALC_MCF_GAS 663
CASING_PRESS 1028
GRAVITY_OIL 49
MCF_GAS 663
TUBING_PRESS 694
Perforation Data:
Interval Top:7550 ft.# Of Holes:120
Interval Bottom:8018 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)64
Total Gas Produced (MCF)4666
GOR72906
GOR DeterminationMCFE
Average BOE per Day2.376
Average MCFE per Day13.802

 Federal Financial Assurance  i 

 Tribal Well  i No