|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2024 Measured TD: 8103 ft. Vertical TD: 7946 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20086959 | Expiration Date: | 12/14/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2630 FNL 2670 FWL | | Bottom Hole Location: | Sec:12 Twp: 2N 68W | Footage: 2630 FNL 2670 FWL | | Proposed Depth/Form: | 8138 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5098 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4107 ft., Bottom: 5098 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2009 | | Spud Date: | 3/16/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8103 ft. | Measured PB depth: | 8080 ft. | | True Vertical TD: | 7946 ft. | True Vertical PB depth: | 7923 ft. | | Top PZ Location: | Sec:12 Twp: 2N 68W | Footage: 2637 FNL 2650 FWL | | Bottom Hole Location: | Sec:12 Twp: 2N 68W | Footage: 2637 FNL 2650 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 751 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 751 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8091 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 3378 ft., Bottom: 8091 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4866 ft. | | N | N | | NIOBRARA | 7324 ft. | | N | N | | CODELL | 7550 ft. | | N | N | | J SAND | 7980 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 2/1/2024 Interval Top: 7984 ft. Interval Bottom: 8018 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/25/2009 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 156,742 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 265,560# SAND 03/25/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7984 ft. | # Of Holes: | 60 | | Interval Bottom: | 8018 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: PR - 2/1/2024 Interval Top: 7550 ft. Interval Bottom: 7570 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/25/2009 | | Treatment Summary: | CDL RECOMPLETION. SET CFP @ 7660'. 03/25/09. FRAC'D THE CODELL WITH 109,620 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 244,340# 20/40 SAND 03/25/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/3/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 21 | | BTU_GAS | 1270 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 25904 | | CALC_MCF_GAS | 544 | | CASING_PRESS | 920 | | GRAVITY_OIL | 49 | | MCF_GAS | 544 |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 40 | | Interval Bottom: | 7570 ft. | Hole Size: | 0.41 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/26/2009 Interval Top: 7550 ft. Interval Bottom: 8018 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/22/2009 | | Treatment Summary: | JSND-CDL COMMINGLE. DRILLED OUT CFP @7660' TO COMMINGLE THE JSND-CDL. 04-09-09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7952 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/26/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 75 | | BBLS_OIL | 38 | | BTU_GAS | 1270 | | CALC_BBLS_H2O | 75 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 17447 | | CALC_MCF_GAS | 663 | | CASING_PRESS | 1028 | | GRAVITY_OIL | 49 | | MCF_GAS | 663 | | TUBING_PRESS | 694 |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 120 | | Interval Bottom: | 8018 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 64 |
| Total Gas Produced (MCF) | 4666 |
| GOR | 72906 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.376 |
| Average MCFE per Day | 13.802 |
| Federal Financial Assurance | i | |
|
|