Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29658
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:JOHNSON #4-2-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:300224LocationID:336365
Municipality/County:FIRESTONE / WELD #123Location:NENW 12 2N68W 6
Field:WATTENBERG - #90750Elevation:4851 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:653FNL  2065 FWLLat/Long: 40.158790 / -104.953680Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158795 / -104.953687Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/19/2011
End Date: 1/19/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 378
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 8050 ft.    Vertical TD: 7944 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/25/2012
Proposed Top PZ Location:Sec:12 Twp: 2N 68W Footage: 1315   2653 
Bottom Hole Location:Sec:12 Twp: 2N 68W Footage: 1303   2653 
Proposed Depth/Form:8012 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: E/2NW4 & W/2NE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: E/2NW4 & W/2NE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: E/2NW4 & W/2NE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 550 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8015 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 6975 ft., Bottom: 8015 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5010 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 4042 ft., Bottom: 5010 ft.

Wellbore Completed
Completion Date:1/6/2011
Spud Date:12/31/2010Spud Date Is:ACTUAL
Measured TD:8050 ft.Measured PB depth:7974 ft.
True Vertical TD:7944 ft.True Vertical PB depth:7868 ft.
Top PZ Location:Sec:12 Twp: 2N 68WFootage: 1315 FNL  2653 FWL
Bottom Hole Location:Sec:12 Twp: 2N 68WFootage: 1303 FNL  2653 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 787 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 787 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8035 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 3660 ft., Bottom: 8035 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4212 ft.
NIOBRARA7188 ft.
CODELL7444 ft.
J SAND7874 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7874 ft.    Interval Bottom: 7902 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/19/2011
Treatment Summary:J SAND COMPLETION. FRAC'D THE J-SAND 7874'-7886' & 7890'-7902', (48 HOLES) W/151,494 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,660 # 20/40 SAND. 01/19/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7874 ft.# Of Holes:48
Interval Bottom:7902 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/19/2011                 Interval Top: 7234 ft.    Interval Bottom: 7902 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/19/2011
Treatment Summary:JSND-CDL-NRR COMMINGLE. SET CBP @ 7220'. 02/19/2011. DRILLED OUT CBP @ 7220', CFP @ 7380', 7550' TO COMMINGLE THE JSND-CDL-NBRR. 02/21/11.
Tubing Size:2.375 in.Tubing Setting Depth:7867 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 91
BBLS_OIL 52
BTU_GAS 1235
CALC_BBLS_H2O 91
CALC_BBLS_OIL 52
CALC_GOR 7827
CALC_MCF_GAS 407
CASING_PRESS 1306
GRAVITY_OIL 51
MCF_GAS 407
TUBING_PRESS 695
Perforation Data:
Interval Top:7234 ft.# Of Holes:200
Interval Bottom:7902 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 7234 ft.    Interval Bottom: 7464 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/19/2011
Treatment Summary:CDL-NBRR COMPLETION. SET CFP @ 7550'. 01/19/11. FRAC'D THE CODELL 7444'-7464' (40 HOLES) W/108,486 GAL 22 # VISTAR HYBRIDCROSS LINKED GEL CONTAINING 250,140 # 30/50 SAND. 01/19/11. SET CFP @ 7380'. 01/19/11. FRAC'D THE NIOBRARA "B" 7234'-7248' AND NIO "C" 7314'-7328' (112 HOLES), W/98,364 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,640 # 30/50 SAND. 01/19/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7234 ft.# Of Holes:152
Interval Bottom:7464 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)114
Total Gas Produced (MCF)7246
GOR63561
GOR DeterminationMCFE
Average BOE per Day3.744
Average MCFE per Day21.725

 Federal Financial Assurance  i 

 Tribal Well  i No